Laserfiche WebLink
Exhibit A <br /> Florida Hospital Zephyrhills <br /> Women's Center - Demolition Only <br /> 6/22/2011 <br /> General Requirements <br /> Builders Risk Insurance by owner <br /> Supervision $ 11,250 <br /> Payroll - Overhead $ 7,500 <br /> Clean-up Payroll $ 5,000 <br /> Temporary Fence $ 3,000 <br /> Dumpster by owner <br /> subtotal $ 26, 750 <br /> Demolition <br /> Hazardous Material Survey $ 4,250 <br /> Selective Demolition $ 25,500 <br /> Concrete & Wall Cutting $ 5,500 <br /> subtotal $ 35,250 <br /> CarpentN <br /> Temporary Walls / Dust Control $ 7,000 <br /> Rough Material and Labor $ 3,500 <br /> subtotal $ i0,500 <br /> Mechanical / Electrical <br /> HVAC Demolition $ 4,020 <br /> Plumbing Demolition $ 5,925 <br /> Low Voltage Demolition $ 3,271 <br /> Electrical / Fire Alarm Demolition - T&M - Not to Exceed $ 8,000 <br /> subtotal $ 21,216 <br /> Subtotal - all line items $ 93,716 <br /> 5% CM Fee $ 3,500 <br /> TOTAL $ 97,216 <br /> Not included in the above oroposal: <br /> Permit, impact, connection, tap, water meter, utility relocation, or any other type <br /> of governmental fee, fire sprinkler work, negative air, asbestos or any hazardous <br /> other material removal <br /> Dumpsters and temporary facilities are assumed to be provided by owner <br />