My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12084
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 2:16:42 PM
Creation date
4/2/2012 2:16:39 PM
Metadata
Fields
Template:
Building Department
Company Name
ST JOSEPH CATHOLIC CHURCH
Building Department - Doc Type
Permit
Permit #
11-12084
Building Department - Name
ST JOSEPH CATHOLIC CHURCH
Address
38710 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
give written notice of a claim for additional compensation or for an extension of time and the parties <br /> shall ag�ee upon an eguitable adjustment. Contractor shall nat delay proceeding with the Work as <br /> change pending such agreement. <br /> b) Contractor shall not be entitled to additional compensation whether for modifications or <br /> additions to the Work not covered in the Contract Doc�ments or far extra labor or materials furnished <br /> unless performed or furnished pursuant to a prior wriiten order signed by Owner. <br /> c� Any changed or additional Work performed by Contractor as ordered by Owner, shall be <br /> performed pursuani to, in accordance with, and subject to aU terms and conditions of the Contract. <br /> Section 5.07 Time <br /> af AH time limits stated in the Coniract Documents are of the essence of the Contract_ <br /> b} ' Contracior shall begin work on or before the date established, to be not less than fourteen { 141 <br /> days from issuance of the building permit or such other date as the parties agree in wr'iting and shall <br /> carry the work #orward expeditiously with adequate forces and comp{ete it� n�_(or within <br /> numbe� ot days}...._. p�jC�jjq�o//f O/�/ ��0�'ei� �!8 - �da� - <br /> Section 5.08 Warranties; Guarantees <br /> a! The Contractor warrants and guarantees that a{I equipment and systems shall be instaited in <br /> accordance with the Contract Documents in the most workman-like manner and will perfotm as <br /> specified herein. <br /> b) At any time during or after installation Coniractor shall repair and replace immediately any and <br /> all Work together with any adjacent work which may be displaced by so doing, that may t�e defective in <br /> materiai, installation, or workmanship. <br /> c) Contractor warrants a�d guarantees all equipment and systems furnished or installed by <br /> Contractor for a period of _�1Fe?Q^ ' from the date of acceptance, or tor such <br /> (onger war�anty periods as may be accorded by the manufacturer thereof or law against defective <br /> materials, design and workmanship. - <br /> d) In the svent Contractor fails to initiate corrective measures within ten (10} days after being <br /> notified in writing by the Owner and complete such corrections promptly the�efare, the Ow�er is <br /> authorized to proceed to have said defect repairec! and Gontractor shall pay alf costs and charges <br /> therefore upon demand. <br /> e) With rega�d to any warranties to be furnished for the work, services, equipment or materials <br /> under this Gontract, Owner shall not be o6ligated to waive any express or implied warra�ties as a <br /> condition to accepting the written warranty to be pravided. <br /> Section 5.09 Use of Project <br /> The use by the Owner of any portion af the Project shalt not affect the dates and times when Progress <br /> Payments become due to Conuactar and shall not prejudice Owner's rights under the Gonuact. <br /> Section 5.10 Cieaning Up <br /> Contractor shall confine its operation at the site to area permitted by law, flrdinances and the Contract <br /> Documents and shall keep the property of the Owner free af all of the accumulated rubbish and waste materials. <br /> Upon comp(etion of the Project, Contractor shafl promptly remove alt rubbish and wasfe materiats all temporary <br /> structures, and all equipment used by it in performing the Coniract. If Coniractor falls to clean up, Owner may <br /> do so and the cost thereof shall be charged to the Contractor. <br /> ARTICLE 6. SUBCON7RACTORS <br /> 4 <br /> (Rev 9/10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.