Laserfiche WebLink
The Contractor shall certify that asbestos-containing building materiais were not used on this project. <br /> Section 8.05 Coordination <br /> The Contractor shaU coordinate his activities with those of the Owner and with the Owner's other direct <br /> Contractors who may be on the site. The Owner reserves the right to change the date to one mutually agreed <br /> upon in the event that a special occasion prevents vacancy of the facilrty. A pre-construction meeting must <br /> take place at least five {5) days before work commences. <br /> COIVTRACTOR: OWNER: <br /> �T, P �%�46 ���G(CiT,raJ✓�„� � ROBERT N. LYNCH, as 8ishop of the <br /> Diocese of St. Petersburg, a Corporation Sole <br /> ` <br /> By: g <br /> Pnnt Name: Print a e:� 1� y� <br /> Title: D�5 . - 1 ��-- <br /> �1 <br /> stor Appr al <br /> 6 <br /> � (Rev 9110) <br />