My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12084
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 2:16:42 PM
Creation date
4/2/2012 2:16:39 PM
Metadata
Fields
Template:
Building Department
Company Name
ST JOSEPH CATHOLIC CHURCH
Building Department - Doc Type
Permit
Permit #
11-12084
Building Department - Name
ST JOSEPH CATHOLIC CHURCH
Address
38710 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION CONTRACT <br /> 7HIS AGREEMENT, made this / <br /> ���day of 1� � , 2 p1�, upon the foliowing terms and <br /> conditions between : <br /> OWNER: Robert N. Lynch, as Bishop of the Diocese of St. Petersburg, a Corporation Sole <br /> (hereaiter "Owner"), having a mailing address of p.Q, Box 40200, St. Petersburg, <br /> F ri a 33 3,and <br /> COIVTRACTOR: /' � <br /> (hereafter Contractor), having a <br /> mailing address of r�Y G <br /> PARISH/SCH�OL• S�� <br /> ADDRESS: <br /> DESCRIPTION OF <br /> WORK _ a � <br /> ARTICLE !. DEFINITION <br /> Section 1.01 Contract. <br /> The term "Contract" means and includes a!f contract documehts, including but not limited to the <br /> Specifications; Drawings; Bidding (nstructions; Construction Contract; Change Orders; Addendum and Exhibits; <br /> and Contractors Proposal. <br /> Sectlon 9.02 Progress Payment <br /> The term "Progress Payment" means any instatlment of the Contraci Price payable in the manner <br /> specified herein. <br /> Section 1.03 Work <br /> The term "Work" means all labor, materials, and equipment necessary to be furnished by Contractor to <br /> perform fully the contract. <br /> ARTICLE 2. CONTRACT DOCUMEf11TS <br /> Section Z.01 Signing <br /> The Owner and Contractor shall sign two (2) copies of each of the Contract. <br /> Section 2.02 Order of Precedence <br /> The Order of Precedence within the Contract is as #ollows: <br /> 1 _ This Contract <br /> 2. Addendum <br /> 3. Specifications <br /> �. Drawings <br /> 5. Bidding Instructions <br /> 6. Contractors Proposal <br /> ARTICIE 3. CONTRACT PR CE• PAYME S• WqIVERS LtENS <br /> -- �(0 GaO� K S / � o/'` O u� / �4 Oa� -� G°dt ��.7� <br /> Section 3.01 Contract Price �Q� �e �� ��-� � �r�A/T�'Q dl'�cip,� , <br /> The total Contract Price shall NOT exceed <br /> DOLLARS AND NO/100 �$ 39 �j$`i(3b }, _ <br /> Saction 3.02 �ay ents <br /> a) <br /> � � <br /> ,�,. _ <br /> A :d <br /> � �l. � �3,�- �.l,a�n c� � � � <br /> pl o�'I �,� �p,�o,�� <br /> (Rev 9J10) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.