My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12127
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 9:34:44 AM
Creation date
5/10/2012 9:34:37 AM
Metadata
Fields
Template:
Building Department
Company Name
ADVANCE AUTO PARTS
Building Department - Doc Type
Permit
Permit #
11-12127
Building Department - Name
ADVANCE AUTO PARTS
Address
5637 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Design'Documentation <br /> Advanced 'Auto Parts <br /> Pasco County <br /> PROJECT DESIGN DOCUMENTATION <br /> 1.0 INTRODUCTION <br /> The project is located in Pasco County at the intersection of 12` Ave. and US-301. This <br /> project is located in Section 11 of Township 26 South and Range 21 East (Please refer to <br /> Figure 1). The proposed project consists of removing existing turf block and replacing it <br /> with concrete. The existing e�ltration system will handle the additional impervious area. <br /> 2.O DRAINAGE DESIGN CRITERIA <br /> The design criteria for this project are based on general conformance with the current <br /> Southwest Florida Water Management District (SWFWMD) rules. Stormwater <br /> management systems must comply with the rules of the Southwest Florida Water <br /> Management District for water quality. The basic drainage criteria are as follows: <br /> 2.1 WATER QUALITY <br /> An Exfiltration system is to provide treatment of the first 0.5" of <br /> stormwater over the basin. The treatment volume shall recover within 72 <br /> hours. <br /> Z.2 WATER QUANTITY <br /> Water quantity does not apply to this project. <br /> 3.O WETLANDS <br /> There are no wetlands located within the project. <br /> 4.0 100-YEAR FLOODPLAIN <br /> The project is located outside of the 100 year floodplain (Please refer to Figure 2). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.