Laserfiche WebLink
�ORM 1�100A-fl8 <br /> ___ Cade Compliance Checklist � _�_ <br /> �_�""�"`�"���'�"' Residential Whole Buildir� ���rm��e Method A- Details �'�� <br /> � _. <br /> ADDRESS: PERMIT #: <br /> , FL, <br /> INFILTRATION REQUCTION COMPLIANCE CNECKLIST <br /> COMPt?NENTS _; SECTION REQUIREMENTS FOR EACH PRACTICE ______ ?_ CHECK <br /> Exterior Windows & C�oors N1106.A8.1.1 __Maximum: .3 cfm/sg.ft. window area; .5 cfm/sq.ft. door area. ` <br /> Exterior & Adjacent Walls N1106.AB.1.2 Caulk, gasket, weatherstrip or seal between: windowsldoors & <br /> f�ames, surrflunding wall; foundation & wail sole or sii! piate; joints <br /> befirveen exterior wall panels at corners; utiiity penetrations; <br /> between wall pane(s 8 top/battom plates; between walls and floor, <br /> EXCEPTION: Frame walls where a continuous infiltration barrier is <br /> � i installed #hat extends fram, and is sealed to, the foundation to the <br /> f { �,plate. <br /> -- - ---- ---- ±__.. ._. -.-- - - - :. _. <br /> Floors N1106.A8.1.2 j Penetrationslopenings > 1/8" sealed unless backed by truss or <br /> ! joint memoers. � <br /> EXCEPTiC?N: Frame flaars where a coniinuous infiltration barrier <br /> is ins talled th at is sealed to the perimeter, penetrations and seams. <br /> ._ - - -- __.._....- --. _ . _._. _ <br /> Ceilings N1106.AB.12 ; 8etween walis & ceilings; penetrations af ceilirrg plane to top flcsor; <br /> around shafts, chases, soffits, chimneys, cabinets sealed to <br /> ' cantinuous air barrier; gaps in gyp board & top plate; attic access. <br /> EXCEPTION: Frame ceilings where a continuous infiltration barrier <br /> is installed that is sealed at the perimeter, at penetratians and <br /> seams. <br /> - � -- -- - - .. ----....._. ._ �_ <br /> Recessed Lighting Fixtures N1106.AB.1.2 Type IC rated with na penetrations, sealed; or i'ype IC or non-IC <br /> ; rated, installed inside a sealed box with 1/2" clearance & 3" ftom <br /> insulation; or Type IC with < 2.0 cfm from conditioned space, <br /> ; tested. <br /> - --- - _. .... __ _ ----- -------. --.._ ._.._.. __ _. _. <br /> Multi-story Houses __ N1106.AB.1.2 _� Air barrier on perimeter of floor cavity between floors._____________ _. <br /> Additional Infiltration reqts N1106.A6.1.3 ` Exhaust fans vented to outdoors, dampers; combustion space j <br /> � heaters comply with NFPA, have combustian air. ( <br /> OTHER PRESCRIPTIVE MEASURES (must be met or exceeded by all residences.) <br /> COMPONENTS _____ � SECTIaN__ �_ REQUIREMENTS______________ _ _._ _ _ ..J <br /> Water Ffeaters ' N1112.A6.3 � Gomply with efFiciency requirements in Table N't112.ABC.3 � <br /> Switch or clea�ly marked circuit breaker (electric) ar cutoff (gas) <br /> ___ ; _ _____ must be �rovided._External or built-in heat trap_reguired________ ! <br /> Switnming Pools & Spas N1172.AB.2.3 Spas & heated paols must have covers {except solar heated). i <br /> , Non-commercial pools must have a pump timer. Gas spa & pool ' <br /> ' heaters must have a minimum thermal efficiency of 78%. <br /> ; Heat pump pool heaters shall have a minimum C�P of 4.0 <br /> ___ _. . _. ' _ " ' _-__. . . . ._. . <br /> Shower heads N1112.AB.2.4 i Water flow must be restricted tt� no more than 2.5 gallons per <br /> � minute at 80 PSIG. <br /> _._ -----_..___._...__ ._ _ _ _. _�..._..._...------... _. . ._ _ <br /> Air Oistribution Systems � IV1110.AB Att ducts, fittings, mechanica[ equipment and plenum chambers <br /> shall be mechanicatly attached, sealed, insulated and installed in <br /> � accordance with the cri#eria of Section N111 �.AB. <br /> t3ucts in unconditioned attics: R� min. insulation. � <br /> --.._ _ _ ._. _. _.__.._.. _. .._. r - <br /> HVAC Controls N1107.A6.2 Separate readity accessible manual or automatic thermostat far j <br /> � each system. � <br /> -- - ---.. _...,._._ .. _.. > --- -- --- - - —� ------ - <br /> Insulation N1104.AB.1 Ceilings-Min. R-19. Common walls-f�ame R-11 or CBS R-3 both <br /> j N1102.8.1.1 sides. Common ceiling & floors R-11. <br /> 5/t2/2011 9:56 AM EnergyGauge� USA- FlaRes2�8 Pags 5 of 5 <br />