My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12225
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 8:50:38 AM
Creation date
5/14/2012 8:45:40 AM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOPSITAL OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
11-12225
Building Department - Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 , <br /> Zephyrhills Fire Rescue <br /> 6907 Uairy Road, Gephyrhills, t'L 335�2 <br /> l�ire Marshal }3us ($13) 780-U041 <br /> Kerc�� 13arnett f�ax (81 ;) 780-OU�4 <br /> y E-mail: kbarnetl�r>fire.Le�hyrhills.(l.us <br /> Plan Review #: 11-106 <br /> Project: Fire Sprinkler <br /> Number of Pages: 1 <br /> August 10, 2011 <br /> I have received and reviewed the plans for the modification of a fire sprinkler system located at <br /> 7050 Gall Blvd and will allow the project to move forward. Paying for permit contractor <br /> acknowledges complying with the items listed below. Should anyone have any questions, please <br /> do not hesitate to contact the Fire Marshal's office. <br /> 1. An additional fee has been assessed for working without a permit per City <br /> Resolution. The fee allowed is double the permit fee per day of operation. The <br /> permit fee is $50. This allows a fee of $100 per day, only $100 was charged. <br /> 2. If the fire sprinkler system is to be shut down for 4 hours or more in a 24 hr <br /> period, a fire watch shall be established by Fl Hospital and proper paperwork <br /> filled out. <br /> 3. A letter shall be supplied to this authority stating that the work conducted does <br /> not affect the overall calculations of the total system. <br /> 4. Ensure all sprinkler plates are off the heads so the heads can be seen. Also <br /> ensure the ceiling tiles next to the heads are removed so the piping can be seen. <br /> 5. Pressure test paperwork will be supplied at the time of the final inspection. <br /> Inspections Required: <br /> l. Pressure Test (normal operating pressure) <br /> 2. Final <br /> / - <br /> KERRY A ETT, FIRE MARSHAL <br /> ***Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveais areas of non-compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.