My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12212
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 11:28:24 AM
Creation date
6/11/2012 11:28:17 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-12212
Building Department - Name
PHILLIP,TODD & DAVIS,STEPHANIE
Address
5610 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> �••• <br /> � Hyperbaric Centers of Floric�a <br /> 21 st Century technology in a safe and caring environment <br /> costs would probably not exceed �8,500.0o for job that a large contractor <br /> would want �zSK to complete. <br /> Unfortunately, our one-man med gas installer is no longer returning our <br /> calls and we are rapidly running out of funds. <br /> To compound our misery we have patients that are ready to start their <br /> treatment as soon as possible. Summer is often the only time that parents <br /> with brain injured children can come for treatment because school is out <br /> for their other children and they need to come to Zephyrhills for three <br /> weeks to receive treatment for their child. <br /> We are therefore requesting that we be allowed to present for your <br /> consideration an interim solution that would allow us to begin treatments <br /> and to use the resulting cash flow to have an outside med-gas installer <br /> come in and make our simple "long term" installation. <br /> Our interim solution calls for us to use off the shelf oxygen and <br /> compressed air components (special service hoses and fittings) to make a <br /> safe and effective temporary installation until we can create some cash <br /> flow from treatments. <br /> Under this interim proposal we would still have Mercury Medical come in <br /> and conduct their pressure and gas purity test which results in a third party <br /> certificate. <br /> We have attached a drawing to this proposal that shows two small cement <br /> pads to be poured on either side our building. A chain link fence on three <br /> sides with a locking gate protects both pads. The fencing to be supplied <br /> with privacy strips within the links. <br /> The pads are approximately q.'W x 5'L. We propose to situate two liquid <br /> Dewar's of inedical oxygen on the pad on the north side of the building <br /> and one Dewar on the south side. Oxygen would be routed through a short <br /> metal braid oxygen service hose into our standard oxygen regulator and <br /> from there through another metal braid oxygen service hose into a fitting <br /> through the external cement wall and into each chamber. <br />
The URL can be used to link to this page
Your browser does not support the video tag.