My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12352
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 12:06:58 PM
Creation date
6/11/2012 12:06:56 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
11-12352
Building Department - Name
LYDECKER,RICHARD
Address
3448 PERIDOT LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. <br /> - =� - -�3 � � � _ <br /> l <br /> Procedure for Lot Im�rovement Requests '� <br /> . (Please ref�r to "Ra��es and Regulations') <br /> 1. A11 requ�sts are to go to Chairman of the Property Evalua,tion Committee, for the committee <br /> to review. There is � ,� r la�a.�led� rr.;P�,onerty �val�t & I�.ro eme ts►� i� th 1� <br /> for L�ot_ow,�g.�.xo., ce ::�� com�lete�d,� <br /> 1` ,;�n.:a�nd .the,as for.ma will. bc.bis�r .�n � <br /> t�e Library b� � Praeertv Ev�nstion committee, , <br /> 2• AnY reQuest which is NOT filled out properiy or in detail; which includes, comp}ete plan <br /> layout, elevations (vvhere applic�ble), written details of improvement being reques�ed, including <br /> color, etc, and any other information pertinent to th� processing of the request, �1 _�� <br /> to the Lot o�r f� ��,� �� b �� p�,��ed 6v the Cuermit�e <br /> 3. Conunittee will review requests and visit the site of the request as necessary. <br /> 4. After #he Committee has approved or denied the request, it will be presented to the Board of <br /> Directors for their approval or denial. <br /> 5• There will be NO more one day approvals or last minute approvals. Request witl take 7- 14 <br /> days for appropriate review and consideration, thus giving the Gommittee and Board mcmbcrs <br /> time to review and consider the request in a thorrugh man�er. <br /> 6. The originai re will be stamped approved or deni <br /> will go into to the members file and the copy returned to th�e I,ot a�ner y the ga� of D'irector <br /> liaison to the committee. ' <br /> �. The commitxee will follow up on requests to determ2ne that the request as presented and <br /> aPProved is being adhered to. <br /> As the owner of Lot # � I understand the Pro <br /> Board of Directors will ent�. �e P��rty to follow the e� v���on Comm.ittee and/or the <br /> ��'° as mitted n the Lot Im P�S�ss of the constivchon or <br /> provement Request. <br /> Lot er�s S� .� � �''// <br /> Date <br /> 4/03/06 �/ — / / / <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.