NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
<br /> which may be more resVictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> � t1NLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or intended conVactor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Sedion at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> contrador, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in exisdng buildings, or expansion of existing buiidings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner', I certify that I have obtained a copy of the above desaibed document and promise in good faith to
<br /> deliver it to the "owner' prior to commencement.
<br /> CONTRACTOR'SlOWNER'S AFFIDAVIT I certity that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certity that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be pertormed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulaUons, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other govemment agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, WaterlWastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection f�qency-Asbestas abatement.
<br /> - Federal Aviation Authoriry-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" wiil be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certiy that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing consVuction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not speafically induded in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall beoome invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
<br /> may be requested, in wriUng, from the Building Otficial for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOU FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING T1MCE IMPRO ENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAI FINANCING, CONSULT
<br /> WITH YOUR LE DE OR AN ORNEY BEFORE RECORDING YO ICE OF COMM NCEMENT.
<br /> FLORIDA JURAT (F. 117. 3)
<br /> OWNER CONTRACT�� �p�
<br /> S cn and swom o( ore e thi Sub cri and swal to (or irmed) fo me this
<br /> bY �..- bY i..�-
<br /> Who is/ e personally kn n to me or has/have prod ed o is/are personally known to pr I� ave produced
<br /> as�entification. , f as identification.
<br /> I C �'
<br /> `_--- � t'� '-
<br /> r, P Notary Public _Notary Pub6c
<br /> Commission No. Commission No.
<br /> Name of Nolary typed, printed or stamped Name of Notary typed, printed or stamped
<br /> .�ZPR'���'�.� SiJ�n�V�Vt -�...� ... -nw...w...._ ,_
<br /> j • • �i Nota �����"'A�LEN SUZANNE DOUGLA„ ALLEN w
<br /> ,,�uw„
<br /> ry Pubiic - ; SP `-
<br /> ; -� *' State of Flp��d :a* *�; Notary Public • State oi Florida
<br /> ,�� ' = MY Comrnis�i� Ex
<br /> e�� Commission #�� z5, 2p�� .: My Commission Explres pct p5, 2011
<br /> ,��'��°;,„..�` DD 'N� e�� Commission # DD714319
<br /> ° •.'�oFF� .•� AN
<br /> ondedThroughNa �•'��,��!��� MBondedThrou9 aUonalNotaryAssn.
<br />
|