Laserfiche WebLink
�� <br /> -Excelient Service, Inc. <br /> dvance Auto Partner Vendor <br /> 121 N Military Traii # 103 <br /> Palm Beach Gardens, FI. 33410 Date August 26, 2011 <br /> Site Information Bill To: Advance Auto Parts Facility <br /> ame dvance Auto Parts Management <br /> Attm Chris Mc Cann <br /> Attn: Chris. McCann <br /> -- d!]�e__Aut� P r�s 9607 ---- -- - ----! Par�s----------- ---------- <br /> ddress --- -- -------------- - <br /> 5637 N. Gail Blvd P.O. Box 2710 <br /> - --------------------- --- ---- --------- - -------------------------- -- <br /> 'h' zip _eph�hills, FL 33541 Roanoke VA 24012 <br /> o furnish and install one complete new 5- ton York roof top XI�NG EQUIPMENT -- -- <br /> own flow package unit. New unit will be installed on a new RTU #1 - XP06000OP1KBA2 / NiF0980881 - 2010 <br /> actory fit roof curb and secured as per engineers mounting RTU #2 - XP06000OP1KBA2 / NiF0020042 - 2010 <br /> etail. To fabricate and instail new metal ducting to direct air as <br /> needed. To furnish and install all new electrical wiring, piping and 3RO UNIT INSTALLATION <br /> isconnect to operate unit. Job will be complete and operating YORK <br /> including new duct mounted smoke detector, fresh air damper, M: D1EZ060A25 <br /> �abor, materials and new 13.0 seer air conditioning equipment. 13.0 SEER <br /> Minor roof penetrations and curb will be sealed by us. To furnish 5-TON ST. COOL <br /> labor and wiring as needed to install new EMS style thermostats. R-410-A <br /> NOTE: If a roofing problem occurs or any water leaks develop 10- YEAR PARTS WARRANIY <br /> hen additional cost will be needed to have AAP's roofing 1- YEAR ON ALLL LABOR <br /> ontractor to seal and warranty penetration. <br /> RE IRED MATERIAL vendor cost vendor ada Line Total <br /> 1- 13.0 Seer York 5- ton R-404-A with 10 kW heat 2 950.00 <br /> ealer, mounting lates, and screws $ 200.00 <br /> Metal style ducting, rills, duct detector digital T-stat <br /> ross bars mountin bolts and su orts $ 1,100.00 <br /> Drain lines, supports and fittings $ 350.00 <br /> $ 250.00 <br /> LABOR ' <br /> 3- Men 10- hours total labor <br /> otal permit cost and service with N.O.C. $ 2,100.00 <br /> 1- Tech 3- hour window to meet inspector $ 350.00 <br /> otal Cterical and engineering $ 210.00 <br /> Electrical contractor $ 400.00 <br /> rane to lift e ui ment $ 1,800.00 <br /> dditional labor and wirin for new tstats and sensors $ 385.00 <br /> ncurred cost - 08/05/11 service call $ 30Q.00 <br /> otal proposal cost including all labor, materials as above $ 130.00 <br /> � 10,525.00 <br /> II Of US at A Service would like to thank you for the opportunity to submit this quote. If you are in agreement, please <br /> ign where indicated below and return by fax or E-mail Quote amount does not include any additional work or materials nor labor which is not <br /> pecified in the above proposal <br />