Laserfiche WebLink
. YKVYV aAL 091311-1 <br /> McENANY ROOFING, INC. <br /> CCG037013 <br /> 8R03 tndustrial Drive <br /> Tampa, Florida 33637 <br /> (813) 98l;-16b9 • Fax: (813) 98R-18S5 • mcenanY�nc�}mcenan �. com <br /> Proposal Submitted To Phone Date <br /> Florida Medical Clinic 813-618-0048 09-12-20ll <br /> Street Job Name <br /> 38135 Market S uare Arbor Rid e Office <br /> City, State and Zip Code Job Location <br /> Ze h rhills, FL 33542 Dade Cit <br /> Attn: Fax Job Phone <br /> Rod Shelton 813-780-8382 <br /> We hereby submit specifications and estimates for <br /> Reroof Scope of Work <br /> 1. Remove all base flashings, coping caps and scuppers. <br /> 2. Sweep and remove all loose rocks from roof. <br /> 3. Clear parapet walis. Remove soil stack and drain flashings. <br /> 4. Install '/�" Densdeck prime insulation 4 X 8 sheets and fasten with 11 fasteners in each board. <br /> 5. Install two layers of modified bitumen membrane by Soprema. <br /> 6. Install new soil stack and drain flashings. <br /> 7. Install new aluminum painted .040 mill coping cap. <br /> S. Provide Soprema's 20-year warranty and McEnany Roofing, Inc.'s two-year workmanship <br /> warrant . <br /> We propose hereby to furnish materiai and labor in accordance with the above specifications #or the sum of: <br /> Thirt Four Thousand, Two Hundred Dollars and Zero Cents ............................................$34 200.00 <br /> Arbitration Clause: Any controversy arising out of this Contract or the performance thereof shatl be decided by arbitration in accordance with the Con�tructian Industry <br /> Rules of tbe American Arbitratiort Association and judgmenE may be entered on the award by any court having jurisdiction. As a condition precedent [01he filing of <br /> an arbitration demand the arties shall en a e in a ood faith mediation of the di ute. <br /> All material is guaraMeed to be as specified. All wotk to be completed in a workmantike manner according to Estimator Name: <br /> standard practices. My alteratron or deviation from above specificatlons invdving e#ra costs will be executed onty <br /> upon wrkten aders. and will become an e�dra charge over and above the estimate. AII agreements ca#ingent �on <br /> strikes, accideMS or �lays beyond our control. Owner to carry fire. tomado arW ather necessary insurance. Our <br /> workers are fuly covered by Workmen's Compensation Insurence. M$rIC � VI President <br /> Due to the eMreme priee volatilify regardirg petroleum produds. the price quoted in this proposal is valid only tor �� <br /> orders placed and paid within Me rrext 45 days. H Mere is an inaease in the price paid by McEnany Foofing. Inc. for <br /> asphal[, polyisocyanurffie, stael w other materials induding tra�portation charges, the amouM of this `�' <br /> proposal/contrad shall be similarly increase to reflect the increased cosGS fo obtain the materials. <br /> Note: This propo may be m by us If not accepted within 3U day <br /> Aeceptance of Proposal - The above prices. speciFications and conditio�s are satis(actory and are hereby accepted. <br /> You aie authorized to do the work as specified. Payment wi11 be made as outlined above Signature <br /> Date of Acceptance <br /> Signature <br />