My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12435
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:44:16 AM
Creation date
6/12/2012 11:44:08 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
11-12435
Building Department - Name
CITY OF ZEPHYRHILLS
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Date: August 10, 2011 <br /> Peggy Anderson Tower Engineer�g Professionals <br /> T-Mobile Towers 3703 Junction Bivd <br /> 12920 SE 38th Street Raleigh, NC 27603 <br /> Bellevue, WA 98006 (919) 661-6351 <br /> Office: (425) 383-3537 rparkerCa�te�grouq.net <br /> Subject: Structural Malysis Report - Revision 3 <br /> T-Mobile D�esignatfon: T-Moblle Reconffguratlon <br /> Site Number: A2G0082A <br /> Site Name: Pasco County (VS) <br /> Engineerfng Firm Designation: TEP Project Number: 110908 <br /> Sit�e Data: 38122 Flenry Dr., Zephyrhills, Pasco County, FL 33540 <br /> Latitude N 28° 14' S2.9 ; Longitude W 82° 1 t' 9.4" <br /> 190 Foot - Self-Supporiing Tower <br /> Dear Ms. Anderson, <br /> Tower Engineering Professiona/s is pleased to submit this "Structural Analysis Report" to deterrnine the <br /> structural integrity of the above mentioned tower. <br /> The purpose of the analysis is to determine structural acceptability of the structure stress level. Based on our <br /> analysis we have determined the stress level for the structure and foundation, under the following load case, to <br /> be: <br /> LC1: Existing + Proposed + Future Equipment SuHidern Capacity <br /> Note: See Table 1 fa the existing, proposed, and future loading. <br /> Sn'ucture ControlYng Camponsrn <br /> 90.8% Leg Section T4 (120' -140') <br /> The analysis has been performed in accordance with the ANSIlTIA-222-G-2-2009 �tructural Standard for <br /> Antenna Su rting Structures and Antennas - Addendum 2 and the 2007 Florida Buildinq Code (with 2009 <br /> Supplement). <br /> All modifications and equipment proposed in this report shall be installed in acxordance with the appurtenances <br /> listed in Table 1 for the determined available structural capacity to be effective. <br /> We at Tower Engineering Professiona/s appreciate the opportunity of providing our continuing prof ssional <br /> services to you and T-Mobile Towers. ff you have any questions or need further assistan on i or any other <br /> projects please give us a call. <br /> Res ull su mitted by: \\�� ��W !' f ����/� j,/ <br /> . �\\ �` N ��/� <br /> � <br /> ' � 0.7 os <br /> = :*_ <br /> drew T. Ha ne, P. E. —���/ �_ J 2 G' �__ <br /> ��� � _ <br /> peY�� � �� � � � STATE OF �i� \ <br /> � <br /> 0 March 8, 2011 Original structural analysis report �/ ��QRfD G ����� <br /> 1 April 21, 2011 Revised struc Metro S I adi�ude proposed ���/a���N A i�? ���� <br /> 1111 <br /> 2 July 5, 2011 Revised structural analysis to indude proposed <br /> Verizon loadi <br /> 3 August 10, 2011 Revised T-Mobile proposed/exitingffuture loading <br /> RISA Tower Report - version 5.4.2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.