Laserfiche WebLink
ti <br /> Date: August 10, 2011 <br /> Peggy Anderson Tower Engineering Professionals <br /> T-Mobile Towers 3703 Junction Bivd <br /> 12920 SE 38th Street Raleigh, NC 27603 <br /> Bellevue, WA 98006 (919} 661-6351 <br /> Office: (425) 383-3537 rparker(c�teddr� �� �.�1-+G����LY WITH ALL <br /> Subject: Structural Analysis Report - Revision 3 pREVAILING Ct.'?��, �' �' DA BUILDING <br /> CODE, NATIO�L �1.�C'T�1� �t"�'9�DE 1�ND <br /> T-INobile Designatfon T-Movi�e Recont�urat�on CITY OF Z�1,��.� �RDINANCES <br /> Site Number: � <br /> Site Name: Pasco County (VS) <br /> Engfneering Flnn p�i'gn�n: TEP Project Number: 11 ��/ ��� <br /> S/te Data: 38122 Henry Dr., ZePhYrfiills, Pasco �����t��( �E�lYRk1�LLS <br /> Latitude N 28° 14' S2,9 ; Longitude W 82'�' ��� 4.. <br /> 190 Foot - Self-Supporting Tower ���� C1EF�.N4{4�ER <br /> Dear Ms. Anderson, <br /> Tower Engineering Professionals is pleased to submit this "Structural Malysis Report" to determine the <br /> structural integrity of the above mentioned tower. <br /> The purpose of the analysis is to determine structural acceptability of the structure stress level. Based on our <br /> analysis we have determined the stress level for the structure and foundation, under the following load case, to <br /> be: <br /> LC1: Existing + Proposed + Future Equipment <br /> Note: See Table 1 for the existing, proposed and fu�ure ioad�r,g. S�iaent Capacity <br /> �trt�cture <br /> Co�rolNng Component <br /> �.$% Leg Section T4 (120' - 140') <br /> The analysis has been performed in accordance with the ANSI/TIA-222-G-2-2009 Structural Standard for <br /> Ant�nna Su000rtina Str„�t� res and Antennas Addendum 2 and the 2007 Florida Buildina .�de (with 2009 <br /> Supplement). - <br /> All modificaUons and equipment proposed in this report shall be installed in accordance with the appurtenances <br /> listed in Table 1 for the determined available structural capacity to be effective. <br /> We at Tower Engineering Professiona/s appreciate the opportunity of providing our continuing prof ssional <br /> services to you and T-Mobile Towers. If you have any questions or need further assistan on i or any other <br /> projects please give us a call. <br /> Res ull su mittedby: \\�`� l� <br /> ��`�� tiw ' / '�o�'%� <br /> `� �,� N q_ / i <br /> ��. <br /> � F � <br /> drew T. Ha ne, P. E. _ s o. 7 09 =*_ <br /> Rev�ion � U�/ ��'1� 2 0 � � `= <br /> � DeM 13s11ld ���� � � � STATE OF � � ` <br /> � March 8, 2011 Original structural analysis report �i O �F ��ORtDP.������ <br /> 1 April 21, 2p11 Revised structural analysis to indude proposed ��� � At- �� ��\ <br /> Metro PCS loadi ��//�� � � � � � ��\\�� <br /> 2 July 5, 2011 Revised structural analysis to indude proposed <br /> Verizon loadi <br /> 3 August 10, 2011 Revised T-Mobile proposed/exiting/future loading <br /> RISA Tower Report - version 5.4.2.0 <br />