Laserfiche WebLink
� � August 10, 201 i <br /> 190 Ft Se/f-Supporting Tower Structura/ Ana/ysis A2G0082A Pasco County (VS) <br /> Project Number 110908, Revision 3 Page 4 <br /> Table 1- Existing/Future/Proposed Antenna and Cable Information <br /> Existing/ Elevation Antenna Model Mount Qty Coax Coax Owner/ <br /> Proposed (Ft) � Type Coax Size Location' Tenant <br /> 7 CMA-B-6521-EO-6 <br /> Existing/ � y0 2 CMA-BDHH/6527/EO-6 � 12� 15/8' BC-Face T-Mobile <br /> Pro osed -_..._. _ <br /> p 7 Andrew ETW190VS72UB TMA � P a�fil� <br /> Future 190 3 Andrew TMBXX-6516-R2M 12' 15/8` BC-Face T-Mobile <br /> 2 Nokia Frie 3 Sector TTRU's Flush <br /> Proposed 190 � Nokia COVP Surge Proiector Mount � ���� BC-Face T-Mobile <br /> 12 DBXNH-65656-R2M <br /> 9 Andrew E15S09P78 18 1 5/8 <br /> 3 Andrew ATCB-B01-xx RET's 12' LP 14 �• <br /> Existing 1�5 3 RRUS11 Dual PA RRU RBS6000 Platform 3 .315" AB-Face AT&T <br /> 1 .774" <br /> 2 DC2-48-60-0-9E 2 g�g <br /> 1 DC6-48-60-18-8F <br /> 2 Scala P1790 4 <br /> Existing 160 4 Scala P2063_4 `12� Sector 12 1 5/8 CA-Face Verizon <br /> Mounts <br /> 3 X7C-FRO-660-4 <br /> Existing 150 6 D6950G65RCZE-M 12� Sector 12 1 5/8 CA-Face Sprint <br /> Mounts <br /> Existing 140 6 HB-X-AW23-33-OOT 12 � 12 1 5/8 BC-Face Metro <br /> Platform PCS <br /> Future 100 1 4' MW Dish P �p e 1 1 5/8 BGFace T-Mobile <br /> Mount <br /> N otes <br /> 1) Coax positioning based on inspection report by SiteMaster 2) Mount assumed per photos <br /> 3) Coax assumed to be stacked 2-on-12-on-12 4) Coax stacked 7-on-12 <br /> 5) Coax assumed to run in (1) row of 12 <br /> Table 2- Design Antenna and Cable Information <br /> Mounting Center Line Quanity of Antenna Antenna Model �uantity Coax Coax <br /> Level (ft) Elevation (ft) Antennas Manufacturer Coax Size Location <br /> 190 190 12 CSA PCSA 060-19 <br /> 175 175 12 CSA PCSA 060-19 Unknown Unknown Unknown <br /> 155 155 12 CSA PCSA 060-19 <br /> 3) ANALYSIS PROCEDURE <br /> Table 3 - Documents Provided <br /> Document Remarks Reference Source <br /> Design Drawings Valmont dated November 13, 1998, _ T-Mobile <br /> Order Number 1M337-01/MF40659 <br /> Geotechnical Report �J Nodarse & Associates, Inc dated December 15, 1996, _ T-Mobile <br /> Project Number 96T-107J-9 <br /> SMGBI Report SiteMaster dated October 28, 2007 - T-Mobile <br /> Correspondence Correspondence from T-Mobile with regards to the existing, _ T-Mobile <br /> proposed, and future loading, SAW dated August 4, 2011 <br /> RISATower Report - version 5.4.2.0 <br />