My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12471
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 1:59:27 PM
Creation date
6/12/2012 1:59:26 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-12471
Building Department - Name
SAJAN,SUBA
Address
5727 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief <br /> Keith Williams Bus (813) 780-0041 <br /> Fax (813 ) 780-0044 <br /> 20 October 2011 <br /> This Officer has reviewed the submitted plans for a LP gas installation at 5727 6�' Street, <br /> Zephyrhills, Florida 33542. Following the review, a conditional approval to proceed is <br /> given. Payment for pernut acknowledges acceptance and compliance of the conditions <br /> noted herein. The following items shall be considered: <br /> 1. Installation must be performed by a licensed LP Gas Dealer or their approved <br /> agents. One has been identified on the plans submitted: Suburban Propane, <br /> Tampa. <br /> 2. Tanks must be installed on a stable base capable of supporting tank weight <br /> when full. Tanks shall not be unstable or easily moved, tipped or rocked. <br /> 3. No ignition sources within 5 feet of the tanks. <br /> 4. No openings to the structure within 36 inches of the tanks. <br /> 5. Protective barriers must be installed (anchored bollards or suitable devices) to <br /> prevent vehicular or pedestrian traffic from encroaching on the tanks, <br /> 6. Gas piping inside structure must be identified as gas piping by permanent <br /> markings or painting so as to identify from plumbing lines. <br /> 7. Valves for tanks sha11 not be permanently locked, accessibility must be <br /> maintained for easy valve access. <br /> Inspections Required: <br /> 1. Tank Installation, system pressure test in presence of certified Gas Dealer <br /> on site. All can be done in one inspection. <br /> Review and approval of the submitted plans does not relieve the contractor from the <br /> responsibility of correcting any deficiencies noted during inspections. <br /> Respectfully submitted on 20 October 2011 by, <br /> r ��� ? ��s.'°_�"�� <br /> Keith A. Williams, EFO, CFO, CMO, MIFireE <br /> Fire Chief <br /> Fire Safety Inspector <br />
The URL can be used to link to this page
Your browser does not support the video tag.