<br /> § 9.4 WARRANTY
<br /> The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be
<br /> of good quality and new unless the Contract Documents require or permit otherwise. The Contractor further warrants
<br /> that the Work will conform to the requirements of the Contract Documents and will be free from defects, except for
<br /> t� i�erent in the quality of the Work the Contract Docuxnents require or permit. Work, materials, or equipment not
<br /> conforming to these requirements may be considered defective. The Contractor's warranty excludes remedy for
<br /> ci�nts�e or defect caused by abuse, alterations to the Work not executed by the Contractor, improper ar insufficient
<br /> ma�tenance, improper operation or normal wear and tear under normal usage.
<br /> § 9.5 TAXES
<br /> 'Iyte Contractar shall pay sales, consumer, use and other similar ta�ces that are legally enacted when bids are received or
<br /> negotiations concluded, whether or not yet effective or merely scheduled to go into effect.
<br /> § 9.6 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS
<br /> § 9.6.1 Unlesa otherwise prorvided in the Contract Documents, the Contractor shall secure and pay for the building
<br /> permit as well as other permits, fees, licenses and inspections by government agencies necessary for proper execution
<br /> and completion of the Work that are customarily secured after execution of the Contract and legally required at the
<br /> time bids are received or negotiations concluded.
<br /> § g.g,2'Ihe Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
<br /> ruies and regulations, and lawful orders of public authorities applicable to performance of the Work. If the Contractor
<br /> perfams Wotk lrnowin8 it to be contrary to applicable laws, statutes, ar dinances, co d e s, r u l e s and re g u lations, or
<br /> lawRil orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear
<br /> the costs attributable to correction.
<br /> § 9,7 ALLOWANCES
<br /> The Cotitractar shall include in the Contract Sum all allowances stated in the Contract Documents. The Owner shall
<br /> sela,t tr►aterials and equipmart under allowances with reasonable promptness. Allowance amounts shall include the
<br /> cost.s to d�e Contractoe of materials and equipment delivered at the site and all required taxes, less applicable trade
<br /> discounts. Allowance amounts shall not include the Contractor's costs for unloading and handling at the site, labor,
<br /> installation, overhead, and �ofit.
<br /> § 9.S CONTRACTOR'S CONSTRUCTION SCHEDULES
<br /> § 9.8.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and
<br /> Archited's informadar a Contractor's construction schedule for the Work. The schedule shall not exceed time limits
<br /> current unda the Cmt�act Documents, shall be revised at appropriate intervals as required by the conditions of the
<br /> Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall
<br /> pravide for expeditious and practicable c�ecution of the Work.
<br /> § 9.8,2 The Contractar shall perform the Work in general accordance with the most recent schedule submitted to the
<br /> Owncr and Architect.
<br /> § 9.9 SUBMITTALS
<br /> § 9.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Architect Shop
<br /> Drawings, Product Data, Samples and similar submittals required by the Contract Documents in coordination with the
<br /> Cantractor's construction schedule and in such sequence as to allow the Architect reasonable time for review. By
<br /> submitting Shop DrawinSs, Product Data, Samples and similar submittals, the Contractor represents to the Owner and
<br /> Architect that the Contractor has (1) reviewed and approved them; (2) determined and verified materials, field
<br /> measurements and field construction criteria related thereto, or will do so; and (3) checked and coordinated the
<br /> ix�gormation contained within such submittals with the requirements of the Work and of the Contract Documents. The
<br /> Work shall be in accardance with approved submittals.
<br /> § 9.9.2 Shop Dr�winSs, Product Data, Samples and similar submittals are not Contract Documents.
<br /> AIA Document A107T"' — 2007. Copyright m 1936, 1951, 1958, 1961, 1963, 1966, 1970, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Archiiects. 8
<br /> Init. p�� �ghts reserved. WARNING: This AIA Document is protaet�d by U.S. Copyright Law and IntemaUonal Troaties. Unauthorized roproductlon or
<br /> distribution oithis AIA DocumeM, or any portion ot k, may rssuk in asvere cNli and eriminai psnakfes, and will be prosscuhd to ths maximum extent
<br /> _ � possibls undsrthe taw. This doeument was produced by AIA soflware at 11 �15:12 on 11/04I2011 under Order No.0875262049_1 which expires on 10/29/2012,
<br /> and is nat for resale. (945440306)
<br /> User Notes:
<br />
|