My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12514
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 2:58:39 PM
Creation date
6/18/2012 2:58:31 PM
Metadata
Fields
Template:
Building Department
Company Name
HR BLOCK
Building Department - Doc Type
Permit
Permit #
11-12514
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7860 7856 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties agree on another method for determining the cost or credit. Pending final determination of the total cost of a <br /> Construction Change Directive, the Contractor may request payment for Work completed pursuant to the Construction <br /> Change Directive. The Architect will make an interim determination of the amount of payment due for purposes of <br /> certifying the Contractor's monthly Application for Payment. When the Owner and Contractor agree on adjustments <br /> to ttu Contract Sum and Contract Time arising from a Construction Change Directive, the Architect will prepare a <br /> Change Order. <br /> § 13.3 The Architect will have autharity to order minor changes in the Work not involving adjustment in the Contract <br /> Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes <br /> shs11 be effected by writtrn order and shall be binding on the Owner and Contractor. The Contractar shall carry out <br /> suct► written aders pran�tly. <br /> § 13.4 If cortcealed a unlmown physical conditions are encountered at the site that dif�er materially from those <br /> indicated in the Contrad Documents or from those conditions ordinarily found to exist, the Contract Sum and Contract <br /> Time shall be equitaMy adjusted as mutually agreed between the Owner and Contractor; provided that the Contractor <br /> pravides notice to t�e Owner and Architect promptly and before conditions are disturbed. <br /> ARTICLE 14 TIME <br /> § 14.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Ageement <br /> the Contracta confu'ms tt►at the Contract Time is a reasonable period for performing the Work. <br /> § 14.2 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in <br /> the Contract Documeats for Substantial Completion of the Work. <br /> § 14.3 The term "day" �s used in the Contract Documents shall mean calendar day unless otherwise specifically <br /> defined. <br /> § 14.4 'me date of Substandal Completion is the date certified by the Architect in accordance with Section 15.43. <br /> § 14.5 Ifthe Contracta is delayed at any time in the commencement or progress of the Work by changes ordered in the <br /> Wak, by labor disputes, fire, unusual delay in deliveries, abnormal adverse weather conditions not reasonably <br /> anticipatable, taiavadable casualties or any causes beyond the Contractor's control, or by other causes which the <br /> Architect deteimines maY justify delay, then the Contract Time shall be e�ctended by Change Order for such <br /> reasonable time as the Architect may determine, subject to the provisions of Article 21. <br /> ARTICLE 15 PAYMENTS AND COMPLETION <br /> § 15.1 APPLICATIONS FOR PAYMENT <br /> § 15.1.1 Whae the Contract is based on a Sdpulated Sum or the Cost of the Work with a Guaranteed Maximum Price, <br /> the Cantract� s�all submit to the Owtter, before the first Application for Payment, a schedule of values, allocating the <br /> entire Contract Sum to the various portions of the Work, prepared in such form and supported by such data to <br /> substandate its accuracy as the Architect may require. This schedule, unless objected to by the Owner, shall be used in <br /> reviewing the Contaracta's Applications for Payment. <br /> � (Paragrap� deleted) <br /> § 15.1.3 Paymalts shall be made on account of materials and equipment delivered and suitably stored at the site for <br /> subsequent incorpastion in the Work. If approved in advance by the Owner, payment may similarly be made for <br /> materials and equipment stored, and protected from damage, off the site at a location agreed upon in writing. <br /> § 15.1.4 'Ilie Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner <br /> no latrr than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment <br /> all Woek €or vvt�ich Certificates for Payment have been previously issued and payments received from the Owner shall, <br /> to the best of th►e Contractor's lmowledge, informadon and belief, be free and clear of liens, claims, security interests <br /> or other encumbrances adverse to the Owner's interests. <br /> § 15.2 CERTIFICATES FOR PAYMENT <br /> I (Paragraph deleted) <br /> AIA Document A107T'" — 2007. Copyright� 1936, 1951, 1958, 1961, 1963, 1966, 1970, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects• 11 <br /> Init. ,q�l rights reserved. WARNING: This AIA� Doeument Is proteeted by U.S. Copyrlyht Law tnd Intsmational Troatlss. Unauthoriz�d roproducUon or <br /> distributlon ot thb AIA DoeumeM„ or any portion ot k, may nsuR in seven eNll and erimfnal penafties, and wlll ba prosecuted to ths maximum extent <br /> _ 1 possibls underthe law. This documentwas produced by AIA software at 11�15:12 on 11l0412011 under Order No.0875262049_1 whieh expires on 10/29l2012, <br /> and is not for resale. (945440306) <br /> User Notes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.