My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12575
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 2:51:53 PM
Creation date
6/19/2012 2:51:52 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
11-12575
Building Department - Name
SESTAK,JUDGE WILLIAM
Address
6722 NORTHLAKE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> �11-18-'11 1�:43 F�OM-County Judges 521-4176 T-40� P0001/0�02 F-369 <br /> � <br /> �` <br /> MilBar Roofin inc. <br /> 15911 U.S. 301, DadB City, FL 33523 state CerE Roofer <br /> #CCC1329092 <br /> Pi1: 800/562-2393 Fax: 352/�67-445A� RCI Reg Roof Consuttant #0148 <br /> milbar�earthlin k.net <br /> R�QF PROPOSAL � ot z <br /> DATE: 11116/91 <br /> TO: SESTAK, JUDGE WI�LIAM PM: 352/518-4013 <br /> 6722 N. LAKE DRIVE CELL; 893l385-8224 <br /> ZEPHYRHILLS, F!. 33542 wsestak 'uds.org <br /> JOB: SE3TAK RESIDENCE <br /> SILV�R OAKS SUBDIVISlON ���� � �� e. <br /> 8722 N. LAK� 17RIVE �--- <br /> ZEPFfYRHIL�$, �R 335a2 <br /> �.�. <br /> , ....__......�-- --.,�.. -------------�.. <br /> ------------ ---�_�------------- <br /> SHINGLE R�-RfJOF <br /> 1. Tear off and haul away existing pne�layer shingle roofing sy$tem. <br /> �• Re-fasten the exisiing plyW�d roof deck in aceordance with current Florida Building Codes. <br /> 3. Prpvide and install the new 15 Ib. saturated felt paper (ASTM D-228) secondary water barrier in sccordance with <br /> current �lorida Building Codes. <br /> 4. Provide and install new alga�-resistant fibsrglass shin�les; provide manufaciurer� s limited shingle warranty_ <br /> Owner fo select shingle and shingle colar from �ptions on pege 2. <br /> 5. Replace all valley flashi�g and heating, ventflating, and air conditioning vents. <br /> 6- Pravide and install new lead boo#s for the plumbing vents. <br /> 7. Provide and install new pre-finished ��white�• alurriinum eavedrip. <br /> Replace the existing ridge vent with 80 I.f, of new pre-finished aluminum ridge �ent. <br /> 8, Repair/f�eplacement of any ro[ten or damaged wood (dsck, fascia, frfm, framing, stc.) wilf be completed on a cost- <br /> plus bes(s above and beyond the contract price. <br /> 9- MilBar Ftoofing, Inc. to provfde a 5-year warkmanship warranty to the original purchaser that covers shingle roof <br /> leaks; exclusions: storm damage, wprk dane or damage by others, tree darnags, and/or sUuctural damage to roof <br /> deck. <br /> 10- Qwner to provide acc.egs to rovf for delivery truck for losding/unlaading of roofing materlals. <br /> 11. MilBar Roofing, lnc. to provide Genersl Liabifity and Worker's CompensaGon Insurance ($2,000,000 limit) and re- <br /> rooflng permit. <br /> we propose ta fumish matenal antl Iabor, complete in aCCO�dance Wlth dbove Spsclflaations, tor the Contract 3um ot• y r � <br /> As stated !n Options pn Pdge x. ' <br /> _�=��=�n��c��aae_������_��_� �_��.....��-- <br /> -....����� �� �������������aaaae�=�:���C�� ����� ����_�_�� <br /> ��������� ������ ���������� <br /> Payment to be rr�ade as tolloWB: DUe Upen Complefian, <br /> 5°�� <br /> �� <br /> '�a <br /> �' <br /> 1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.