My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12559
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 3:24:26 PM
Creation date
6/19/2012 3:19:39 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-12559
Building Department - Name
DELGADO,GLORIA
Address
5225 10TH ST HISTORIC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZEPHYRHILLS HISTORIC PRESERVATION BOARD MINUTES <br /> A Historic Preservation Board Meeting was held on Tuesday, November 15, 2011, in the <br /> conference room at the Municipal Building at 5:00 P.M. Chairman Geiger called the meeting to <br /> order at 5:10 p.m. as a quorum was present. Roll call was taken. Present were members <br /> Jason Aiken, John Geiger, Marian Riopelle and Tracy Sullivan. <br /> 1. Appli cation for a Historic District "Certificate of Aqpropriateness" submitted <br /> bv Gloria Delaardo (File No. 8PA805) for prooertv located at 5225 10 Street The owner is <br /> proposina an addition and plans have been arovided <br /> Staff verified that this home is a 1925 Craftsman architectural style and is a contributing <br /> structure in the Historical District. Taylor Goldsmith, contractor from Lake�and provided plans <br /> for the addition and pictures showing the existing structure. He was unable to attend the <br /> meeting but said he could be contacted by his cell phone (863) 602-0745 for any questions. <br /> The Board reviewed the proposed plans and pictures submitted by the applicant. After <br /> discussion, staff was requested to call the Mr. Goldsmith to verify that the original roofline was <br /> going to be continued on the extension. He verified the roof line of the original structure will be <br /> extended and that he would agree to keep the chimney on the roof even though the fireplace is <br /> going to be removed from the interior of the house. <br /> After staff reported the contractor's responses to the Board, Tracy Sullivan moved to <br /> approve the proposed addition with the condition that the chimney be retained as is and with the <br /> understanding that the new roof will match the existing structure's roofline. Motion was <br /> seconded by Jason Aiken. Motion passed unamiously. <br /> Meeting was adjourned at 5:45 pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.