Laserfiche WebLink
. , -�� �� �' <br /> Jac ueline Bo es � <br /> To: Alex Hulbert <br /> Subject: RE: YMCA Portables <br /> From: Alex Hulbert fmailto:alexCa�oneevergreen netl �^ YJ ------- --- <br /> Sent: Tuesday, December 20, 2011 8:24 AM <br /> To: Jacqueline Boges <br /> Subject: Fwd: YMCA Portables <br /> Ms. Boges, <br /> I meant to add you to the cc on this email. I apologize. <br /> Alex Hulbert <br /> One Evergreen, Inc. <br /> Sent from my iPhone <br /> Begin forwarded message: <br /> From: Alex Hulbert <alex@oneever�reen.net> <br /> Date: December 20, 20117:53:45 AM EST <br /> To: Bill Burgess <bbur�ess@ci.zephvrhills.fl.us> <br /> Cc: Eric Abercrombie < eric@mvnewwalk.com >, "Mr. Gary Baldus" < garv@mvnewwalk.com >, Matt <br /> Hulbert <matt@matthulbertrealtv.com>, "Mr. Scott Drinkwater" <srdrinkwater �mail.com>, "Mr. Matt <br /> Grohocki" <matt@mvnewwalk.com> <br /> Subject: Re: YMCA Portables <br /> Bill, <br /> At what point would you like to inspect the portables? On any project that I've been a part of the <br /> contractor has always called for the inspections. From my understanding the portables are in with <br /> foundational piers and tie-downs. Some of the skirting has been installed, the decking and ramps were <br /> to be installed yesterday and the electric was to be finished last night. Sidewalks are to be poured this <br /> week for the ADA ramps. <br /> Please advise. <br /> Alex Hulbert <br /> One Evergreen, Inc. <br /> Sent from my iPhone <br /> On Dec 16, 2011, at 4:47 PM, "Bill Burgess" <bbur�ess ci.zeqhvrhills.fl us> wrote: <br /> Alex, <br /> Staff has reviewed this issue and have made a determination to administer the <br /> following. Based on the fact that the required masonry foundation wall is a city code <br /> i <br />