GENERAL NOTES <br />1- GENERAL NOTES APPLY TO ALL ELECTRICAL DRAWINGS, UNO. <br />2 ELECTRICAL WORK SHALL BE PER THE FBC 2007 AND ALL <br />ASSOCIATED ADDENDUMS, NATIONAL ELECTRICAL CODE 2008, <br />LOCAL CODES AND ORDINANCES, CONNECTING UTILITY, <br />MANUFACTURES INSTRUCTIONS, AND PROFESSIONAL WORK <br />PRACTICES, AS REQUIRED FOR COMPLETE AND OPERATING <br />SYSTEMS. NOTIFY OWNER OF ANY PROBLEMS PRIOR TO <br />CONSTRUCTION. <br />120/208/3ph <br />Phase A <br />Black <br />Phase B <br />Blue <br />Phase C <br />Red <br />Neutral <br />White <br />Bond <br />Green <br />3 POWER, SERVICE, CONTROLS, DEVICES, EQUIPMENT, ETC SHALL <br />BE CONSTRUCTED WHILE REUSING AS MUCH OF THE EXISTING <br />MATERIALS AS POSSIBLE. <br />4- NEW MATERIALS SHALL BE NEW & IN GOOD CONDITION. WIRE <br />SHALL BE STRANDED COPPER. TWH/TWN INSULATION SHALL BE <br />75 °C OR ABOVE. SERVICE CONDUIT AND TUBING SHALL BE PVC. <br />OTHER CONDUIT SHALL BE RGS. WET WELL PIPING SHALL BE <br />INTERNALLY COATED. <br />5- WIRE COUNTS, RUNNERS, GROUNDS, CABLE, BLOCKS, BOXES, <br />CONNECTORS, CLAMPS, HANGERS, ETC ARE INSTALLERS <br />RESPONSIBILITY. VERIFY CIRCUIT PROTECTION, WIRE AND <br />CONDUIT SIZE, PHASES, AND EQUIPMENT LOADS PRIOR TO <br />FEEDER CONSTRUCTION. <br />6- 3/4" x 10' COPPER CLAD DRIVEN GROUND RODS, MINIMUM 6-0" <br />APART. GROUNDING CONDUCTOR SHALL BE NOA AWG FOR <br />SERVICE CONDUCTORS SMALLER THAN 3/0 AWG. BOND <br />GROUNDING CONDUCTOR TO ELECTRODE CONDUCTOR AT <br />BOTTOM OF CONCRETE SLAB. CONTRACTOR SHALL MEASURE <br />THE RESISTANCE OF INSTALLED GROUNDING ELECTRODES AND <br />IF ABOVE NEC ARTICLE 250 ALLOWABLE VALUES, CONTRACTOR <br />SHALL AUGMENT THE GROUND SYSTEM AS NECESSARY. <br />7 AVAILABLE SHORT CIRCUIT CURRENT RATING SHALL BE <br />PROVIDED BY THE UTILITY. VERIFY THE MAIN BREAKER AND <br />PRESENT SERIES RATED CIRCUIT BREAKERS ARE AIC RATED AT <br />OR ABOVE THIS VALUE AND REPLACE IF REQUIRED. <br />DRAWING NOTES <br />1. MODIFY, REFURBISH AND COMPLETE EXISTING <br />ELECTRICAL SYSTEM. ELECTRICIAN TO PROVIDE <br />POWER FROM THE NEW SERVICE THROUGH THE <br />EXISTING PANELS AND ONTO THE INDICATED <br />NEW RECEPTACLES. <br />2. SEE SHEET E -2 FOR HVAC EQUIPMENT, <br />3. INSTALLER IS TO VERIFY POWER AND BREAKER SIZE <br />FOR ALL EQUIPMENT PRIOR TO CONSTRUCTION. <br />CONSTRUCTION NOTES <br />O SEE WALK -IN COOLER SHOP DRAWINGS FOR <br />DOOR LIGHTS, DOOR HEATERS AND LOCATION <br />OF POWER CONNECTIONS. <br />O ALL KITCHEN AND PREP AREA RECEPTACLES <br />SHALL BE GROUND -FAULT INTERRUPT TYPE. <br />1/4 = 1 1 -0 11 <br />EXTG. METER TO BE REMOVED <br />_LEC <br />/ICE <br />FROM EXTG, POLE <br />TRANSFORMER <br />