My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12672
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-12672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:58:49 PM
Creation date
6/20/2012 2:56:30 PM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOSPITAL ANGIOGRAPHY ROOM
Building Department - Doc Type
Permit
Permit #
12-12672
Building Department - Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief Bus (813) 780-0041 <br /> Keith Williams Fax (813) 780-0044 <br /> 3 January 2012 <br /> Plan Number 12-001 <br /> Number of Pages: 3 <br /> Date received: by City 12-29-11, by ZFR 01-03-2012 <br /> This Officer has reviewed the submitted plans for demolition and new construction of fire <br /> sprinkler system at Florida Hospital Zephyrhills, 7050 Gall Blvd. Following the review, a <br /> conditional approval to proceed is given. Payment for permit acknowledges acceptance <br /> and compliance of the conditions noted herein. The following items shall be considered: <br /> 1. Demolition and Installation must be performed by a licensed Fire Sprinkler <br /> Contractor. One has been identified on application. Demolition has occurred <br /> prior to a site visit on this date. <br /> 2. All of the installation shall be in accordance with NFPA 13, latest edition. <br /> 3. It should be noted that the new construction plans for the first floor show 20 <br /> heads to be installed as per the drawing, however; the detail notes state 19 <br /> heads to be in the new construction. Drawing and description are equal. <br /> 4. Contractor shall follow general and keyed notes as per plans. <br /> 5. The contractor shall insure that the type/model of new sprinkler heads shall be <br /> included in the required sprinkler head box if these are a change in the <br /> existing sprinkler head types in the remainder of the building. (It is not <br /> believed that these are different type heads, but must be included if they are <br /> different) <br /> 6. "As-builY' drawings shall be provided to the owner showing placement of <br /> heads in relation physical features of the completed project and on site at final <br /> inspection. <br /> Inspections Required: <br /> 1. Rough-in Inspection shall be required after new installation. <br /> 2. Final inspection shall be conducted after construction has been completed. <br /> Review and approval of the submitted plans does not relieve the contractor from the <br /> responsibility of correcting any deficiencies noted during inspections. <br /> Respec lly sub itted on 3 January 2012 by, <br /> ���� <br /> � <br /> Keith A. Williams, EFO, CFO, CMO, MIFireE <br /> Fire Chief <br /> Fire Safety Inspector, # 148104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.