My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10094
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2013 10:58:05 AM
Creation date
1/16/2013 10:58:03 AM
Metadata
Fields
Template:
Building Department
Company Name
BANK OF AMERICA
Building Department - Doc Type
Permit
Permit #
10-10094
Building Department - Name
BANK OF AMERICA
Address
5632 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CBRE <br /> C8 RICHARD EIUS <br /> Work Authorization <br /> Master Contract No. LSPCALDEV20100581.00 <br /> CBRE Real Estate Services, Inc.hereby authorizes the Work and/or Services described hereunder pursuant and in accordance <br /> with the terms and condifions of the Master Services Agreement/Contract referenced above <br /> ""•""*"TNIS FORM 1S NOT VALID WtTHOUT A WORK AUTHORIZATION NUMBER"`•""'•' <br /> Project Name: Zephyrhills ADA CBREWark Authorization#: FL.O'l40.09-004-ADA09043 <br /> issue Date. 1/5/2010 CBRE P�oject Number: FL.0140.09 <br /> Supplier Name: Cal Development, Inc. CBRE Project Manager: Albert Anderson <br /> Supplier Contact: Patrick Keane PjM Manage�Tel&Fax: a�a-s�2-sa33 813-812-8249 <br /> CW Job Number: ADA09043 Sr.Managem�t.Contact: Faye Darden <br /> Estimated Due Date: BAC Facility Location Name: <br /> ProJect Type: R=Retaii , Address: 5632 Gall Bivd. <br /> Project Architect: CitylStatelZip: Zephyrhilis!FL/33539 <br /> .Scope of Work: Costs include interior partitions,fixtuFes,flooring,new ADA parking(to include paving,survey, <br /> testing),and markings. <br /> .Exhibits or Pfease tlst all drawing(s),pians,specifrcations,addettda w other documenfs appl'�cable fo this Work Authorization• <br /> ile Attachments: <br /> .Instructiona: in accordance with your contract for the Project listed above: <br /> a.Please provide Consulting Services based an the Hourly Rates Exhibit,not to ${Coat of Serviceati. <br /> — exceed: <br /> _ b Please prepare a Budget Proposal Form(BPF)or Schedule of Values(SOV)for the above Scope of Work <br /> _X_ c.Please begin execution of the Scope of Wo�C for the ProJect Asted above(BPF/SOV/Proposal attached) <br /> .PriCfng: SuppRer warrants and covenants to provide the Work and Services tor the Prtce Nsted below: <br /> �SP : $78,383.89 <br /> CBRE Projed Manager: Thts form must be physicaily signed by both Contractor and the CBRE personnel having the approp�iate signing authority <br /> .CBRE t � `'� <br /> utho�ization: M:� � • � P <br /> � <br /> Name Date Title <br /> .Supplier �-s + <br /> cceptance: ,� - ""''�-� C--'A-'�-'�- ' ��0 p �r'eS,�ciQitC-� <br /> Name Oate Titte <br /> I hereby acknowiedge recoipt and accept the commtssion of the Services andtor Work as stated herein for lhe Price Iisted <br /> above. The signatory represents they are a duly authorized representative of the Coniractor with contractual authority to <br /> bind Contractor with res ct to ihe Services and the Work descxibed herein. <br /> .Dates: Piease define the Canmencement Date,Date of Substantiai Comptetion and Date of Final Completion: <br /> Commencemem Date: Datc of Substantisl Complction: Date of Final Completion: <br /> tl512010 3/18/2010 4/15l2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.