My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10771
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2013 11:00:34 AM
Creation date
1/16/2013 11:00:33 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10771
Building Department - Name
FINLAY INTERESTS 13 LTD
Address
38450 VALLEY OAKS CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Q,port on Pmposals A2006—Copynght,NFPA NFPA 24 <br /> Contractor's Material and Test Certificate for Underground Pipin r <br /> PROCEDURE `� <br /> Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by an er's � <br /> representative.All de(ects shall be corrected and system left in service before contractor's personnel finally leave the job. <br /> A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,a <br /> contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulry materiai,poor <br /> workmanship,or failure to comply with approving authority's requirements or loral ordinances. <br /> - - ------ - <br /> Property name � ---- --- <br /> --- <br /> G'��Vl(�e Re,�. 'f Date . <br /> — ---- =--- �� ���-'---� --- ----- --- !----��-"L3"/�— ---- <br /> Property address � �� � <br /> �a � r Z , <br /> Accepted by approving a orities(names) �l'� O� �� r 1 1 I�� <br /> Address y� �r -�� I ��j rY�` - ------ -- <br /> Plans --- - -SJ JS_��= S�f��Q��_ �!L- il���a_ -- <br /> Installation conforms to accepted plans r Yes � No <br /> -�-- — <br /> i Equipment used is approved r� Yes I_�I No <br /> If no,state deviations � <br /> Has person m charge of fire equipment been instructed as to location of j I Yes �� No <br /> Icontrol valves and care and maintenance of this new equ�pment? <br /> If no,explain <br /> -- - <br /> Instruetions - ------- --- - <br /> Have copies of appropriate instructions and care and maintenance �i Yes �; No <br /> charts been left on premises? <br /> If no,explain <br /> Location Suppl�es buildings <br /> Pipe types and class I <br /> Type joint <br /> R I$ � GAs r�e� <br /> --- �f��'-zPP�B�� ---- � — - <br /> Pipe conforms to Fittin $ slandard �+,_,/� Yes [__' No <br /> Underground conforms To �\h��_��jstandard � Yes J No <br /> pipes and joints If no,explain <br /> Joints needed anchorage clamped,strapped,or blocked in i=�I Yes I_] No <br /> accordance with - __ ___standard <br /> If no,explain <br /> Flushina; Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as <br /> hydrants and blow-offs. Flush at flows not less than 390 gpm(1476 Vmin)for 4in.pipe,880 gpm(3331 Umin)tor 6-in.pipe,1560 <br /> gpm(5905 Umin)for 8-in,pipe,2440 gpm(9235 Umin)tor 10-in.pipe,and 3520 gpm(73,3Z3 Umin)for 12-in.pipe. When supply <br /> cannot produce stipulated flow rates,obtain maximum available. <br /> fiydrostatic: All piping and attached appurtenances subjected lo system working pressure shall be hydrostatically tested at 200 psi <br /> Test (�3.8 bar)or 50 psi(3.4 bar)in excess of the sysTem working pressure,whichever is greater,and shall maintain that pressure±5 psi <br /> description for 2 hours. <br /> Hydrostatic Testinq Allowance: Where additional water is added to the system to maintain the test pressures required by 10.10.2.2.1, <br /> the amount of water shall be measured and shall not exceed the limits of the following equation(For Metric Equation See Section <br /> 10.102.2.4): L = testing allowance(makeup water),in gallons per hour <br /> �_ SDJP S= length of pipe tested,feet <br /> 148,000 D= nominal diameter of the pipe,�n inches <br /> P= average test pressure during the hydrostatic test,in pounds per sq�are mch(gauge) <br /> New underground piping flushed according to ���� Yes � No <br /> _-___ _.__ standard by(company) <br /> If no,explain <br /> -- --—---- --------- -- -- --- -------- -- - ---- <br /> i----- <br /> How flushing flow was obtained Through what type opening <br /> Flushin �'Public water `�Tank or reservou �-'Fire um I �I H drant butt `-� <br /> 9 .� P P I _ , Y LJ Open pipe <br /> tests -— --- -- — ----- ----- ----- --- - <br /> �ead-ins flushed according to__ ___.___ standard by(company) �r� Yes `� No <br /> I If no,explain <br /> I -- - --- -- --- ------- ---------- - ----- ------- - <br /> C How flushing flow was obta�ned Through what type opening <br /> _� Pubhc water '-j Tank or reservoir � � <br /> _�Fire pump i__�Y connection to flange �Open pipe <br /> and spigot NFPA 24(p,1 ot 2) <br /> 24-1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.