Laserfiche WebLink
FRAMING NOTES: <br />1) ALL WOOD USED FOR -SOLE PLATES OR iN CONTACT <br />WiTH SOIL WILL BE 02 PT SOUTHERN YELLOW PINE . <br />2) ALL INTERIOR AND EXTERIOR WALLS SHALL BE <br />02 SPRUCE OR BETTER AND SPACED 16" CC, <br />3) ALL ENG, WOOD BEAMS SUCH AS MICROLLAMS <br />HAVE BEEN DESIGNED ACCORDING TO THE <br />{ TRUS5JOIST SPECIFICATIONS, <br />4) ALL OF THE SIMPSON FASTENERS AND HANGERS <br />MAY BE REPLACED WITH THOSE OF EQUAL OR GREATER <br />f VALUES, ALWAYS VERIFY THIS WiTH THE ENG. OF RECORD, <br />5) ALL ELECTRICAL,PLUMBING AND MECHANICAL ROUGH INS <br />MUST BE COMPLETED, INSPECTED AND APPROVED PRIOR <br />TO REQUESTING A FRAMING INSPECTION. <br />6) ALL INTERIOR DIMENSIONS ARE GIVEN TO THE INDICATED <br />CENTER OF THE STUD UNLESS NOTED OTHERWISE. <br />7) ALL OF THE EXTERIOR DIMEN51ON5 ARE GIVEN TO THE <br />FACE OF THE FRAME OR MASONRY WALL WHICH WILL <br />ALIGN WITH THE FOUNDATION WALL BELOW. (FRAME <br />WALLS ARE HELD IN 1/2" TO ALIGN THE EXTERIOR <br />SHEATHING WITH THE FOUNDATION), <br />S) ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY <br />SHALL BE PRESSURE TREATED LUMBER. <br />3) ALL WOOD HEADERS ARE TO BE NO LESS THAN A DBL 2X0 <br />#2 SOUTHERN YELLOW PINE. <br />( NO PLYWOOD SPACERS REQUIRED) <br />10) ALL FLOOR JOIST, ROOF RAFTERS, AND HEADERS <br />SHALL BE NO LE55 THAN 02 SOUTHERN YELLOW PINE <br />LUMBER, IF THE LUMBER WILL BE IN THE WEATHER OR <br />CLOSER THAN 18" FROM THE GROUND IT WiLL NEED <br />TO BE PRESSURE TREATED. EXCEPT AS NOTED, <br />I <br />11) ALL TEMPORARY AND PERMANENT BRACING INFORMATION <br />FOR THE ENGINEERED ROOF TRUSSES WiLL BE FURNISHED BY <br />THE TRUSS COMPANY THAT PRODUCES THE TRUSSES. <br />12) NAIL 2x BLOCKING BETWEEN TRUSSES IN ALL AREAS THAT <br />A PLY -CLIP CANT BE APPLIED, <br />8 "x10" COMPOSITE <br />POWER BOX STEEL LINTEL <br />( 3000 PSI GONG.) <br />TOP COURSE LINTEL BLOCK <br />WiTH (1) '5 CONT, REBAR <br />POWER BOX STEEL LiNTEL <br />E POURED SOIL ID IJIT14 3000 Pia <br />CONCRETE NO REE3AR REQUIRED <br />, <br />, <br />, <br />-�F "A50NRY OPENING <br />8"xi6" COMPOSITE <br />POWER STEEL LINTEL <br />( 3000 PSI CONC,) <br />TOP COURSE LINTEL BLOCK <br />WITH (1) #5 CONT, REBAR <br />POWER 5TEEL LINTEL AND LINTEL 5LOCK <br />POURED SOLID WITH 3000 PSI <br />CONCRETE NO REBAR REQUIRED <br />'- ?ASONRY OPENING <br />8 "x16" COMPOSITE PRECAST LINTEL; <br />( 3000 PS1 GONG.) f <br />TOP COURSE LINTEL BLOCK <br />WITH (1) •5 CONT, REBAR <br />PRE -CAST U- LINTELS <br />POURED 50L,D WITH 3000 PSI <br />CONCRETE= NO REBAR RF0UiRFD <br />MASONRY OPENING: <br />, <br />I <br />1) <br />2) <br />3) <br />4) <br />5) <br />6) <br />'l) <br />a) <br />GAF STANDARD <br />SHINGLE DETAIL. <br />I1'il I1 LEY LiNiNG MATERIAL <br />6"" MIN. <br />NORMAL WIND LOAD���� <br />5" EXPOSURE <br />O � � <br />FL# 10124.1 2" CENTERLINE <br />ALWAYS REFER TO THE MANUFACTURERS <br />SPECIFICATIONS FURNISHED TO THE JOB61TE. <br />4 "x5" ANGLE 2& GAUGE GALVANIZED METAL <br />RUBBER VALLEY FLASHING OVER THE TOP OR <br />12" WIDE 26 GAUGE GALVANIZED METAL <br />ALL SHINGLES ARE TO BE NAILED WITH 11 OR 12 GAUGE <br />GALVANIZED NAILS WITH 3 /8'l DIAMETER HEADS. ALL NAILS <br />MUST PENETRATE AT LEAST 3/4" INTO THE WOOD SHEATHING, <br />51MP50N HETA 16 <br />EMBEDDED TRUSS STRAPS <br />MIN OF 4" EMBEDDMENT, <br />FL #11473.3 \ <br />ALUM. DRIP EAV \ <br />PRE FINISHED FASCIA <br />OVER 2X SUB- FASCIA <br />ALCOA VENTED SOFFITT <br />FL# 11191.8 <br />8703,6.1 EXTERIOR PLASTER <br />EXTERIOR USE OF PORTLAND CEMENT <br />PLASTER SHALL COMPLY WITH APPLICATION <br />REQUIREMENTS OF ASTM C926 -98 AND C 1063 --37 <br />PRE CAST CONCRETE SILL <br />8 CONCRETE BLOCK <br />EXTERIOR WALLS <br />i <br />1/2" CDX (32/24) OR 0515 SHEATHING 4 PLY MIN, <br />NAILED WITH 8d COMMONS AT 6" CC EXCEPT AT <br />THE GABLE BRACING: AREA NAIL AT 3" OC, <br />FIBERGLASS SHINGLES INSTALLED <br />PER THE DETAIL OF THIS PLAN OR <br />AS PER THE MANUFACTURER iF <br />ANOTHER TYPE OF SHINGLE <br />15 CHOOSEN <br />GAF -ELK ROOF <br />UNDERLAYMENT <br />FL" 10626,1 <br />, <br />j ALL TEMPORARY AND PERMANENT <br />/ I BRACING INFORMATION FOR THE <br />ENGINEERED ROOF TRUSSES <br />WiLL BE FURNISHED BY THE <br />TRU55 COMPANY THAT <br />PRE -ENG, WOOD TRUS5E5 PRODUCES THE TRUSSES, <br />R -30 INSULATION <br />POURED LINTEL BLOCKS WiTH (1) #5 ROD <br />TIED TO VERT RODS iN FILLED CELLS <br />POURED LINTELS OVER; ALL OPENINGS <br />1/2" DRYWALL OVER iX FURRING STRIPS <br />AND RIGID INSULATION R -6 <br />SEE DETAIL SHEET OF THiS PLAN FOR <br />WINDOW AND DOOR IINSTALLATION. THE <br />CONTRACTOR iS RESPONSIBLE TO HAVE <br />INSTALLATION IN5TRU4CTIONS ON THE JOBSITE <br />IF OTHER COMPONEN4T3 ARE CHOOSEN, <br />INTERIOR TRIM FINISHED FLOORING <br />I , <br />#5 REBAR iN FILLED CELLS <br />PER FOUNDATION PLAN CLEAN TREATED SOIL <br />FINISHED GRADE <br />THE BOTTOM ON THE F00TEIR <br />WILL BE A MIN OF 12" INTO <br />EXISTING THE GROUND 16° <br />(CROSS SECTION <br />TREATMENT; C SOIL CHEMICAL iICAL BARRIER MErHoD) <br />A PERMANENT SiGN TO IDENTIFY THE TERMITE TREATMENT FROVIDER AND <br />NEED FOR RE- iNSPECTiON AND TREATMENT CONTRACT RENEWAL 514ALL BE PROVIDED. <br />THE 51GN SHALL BE POSTED NEAR THE WATER HEATER OR ELECTRIC PANEL <br />CONDIN5ATE AND ROOF DOWN SPOUTS 5NALL DiCHARGE AT LEAST 1' -0" AWAY FROM <br />THE BUiLDiNG 5iDEWALLS <br />IRRIGATION SYSTEMS ;INCL �D:ING ALL RI ER5 AND SPRAY HEADS "HALL <br />NOT BE INSTALLED UJITH:N 1' -0" OF THE BUILDINGS 510EILIALLS <br />TO PROVIDE FOR INSPECTiON FOR TERMITE INFE6TATiON BETWEEN WALL COVER N( s <br />AND FINAL EARTH GRADE SHALL NOT BE LESS THA 6 INCHES ( EXCEPTION PAINT OR <br />DECORATIVE CEMENTIOUS FINISH LESS THAN 5/6" THICK ADHERED DIRECTLY TO THE <br />FOUNDATION WALL.) <br />INITIAL TREATMENT SHALL BE DONE AFTER ALL EXCAVATION AND BACK F`LL IS COMPLETED. <br />SOIL DISTURBED AFTER THE NITIAL TREATMENT SHALL BE RETREATED INCLUDING SPACES BOXED <br />OR FORMED. <br />BOXED AREAS IN CONCRETE FLOORS FOR SUBSEOUENT INSTALLLATICN OF TRAPS, ETC. SHALL BE <br />MADE WITH PERMANENT METAL OR PLA571C FORMS. PERMANENT FORMS MUST BE OF A SIZE AND <br />DEPTH THAT WILL ELIMINATE THE D15TURBANCE OF SOiL AFTER THE 'NITiAL TREATMENT , <br />A MINIMUM n MIL VAPOR RETARDER MUST BE INSTALLED TO PROTECT AGAINST <br />RAINFALL DILUTION, IF RAINFALL OCCURS BEFORE VAPOR RETARDER PLACEMENT, <br />RE- TREATMENT 15 REQUIRED, <br />1/2" CEILING DRYWALL <br />ON ALL INTERIOR CEILINGS <br />SEE FLOOR PLAN FOR <br />CEILING HEIGHTS <br />9) CONCRETE OVER POUR .AND MORTAR ALONG THE FOUNDATION PERIMETER MUST BE <br />REMOVED BEFORE EX7EPR;CR 501L TREATMENT <br />10) SOIL TREATMENT MUST BIE APPLIED UNDER ALL EXTERICR CONCRETE OR GRADE WITH 1' -0" <br />OF THE STRUCTURES 51DE WALL5, <br />11) AN EXTERIOR VERTICAL CHEMICAL BARR;ERS MUST BE INSTALLED AFTER <br />CONSTRUCTION i5 COMPLETE INCLUDING LANDSCAPING AND 'IRRIGATION, <br />ANY SOIL DISTURBED AFTER THE VERTICAL BARRIER 15 APPLIED, SHALL BE <br />RETREATED. <br />12) ALL BUILDiNG5 ARE REOL UIRED TO HAVE PRE - CONSTRUCTION TREATMENT <br />13) A CERTIFICATE OF COMP'LiANCE MUST BE ISSUED TO THE BUILDING DEPARTMENT BY <br />A LICENSED PEST CONTRcOL ✓OMPANY SEFORE A CERTIFICATE OF OCCUPANCY WILL <br />BE ISSUED. THE CER1 7FfC.ATE OF COMPLIANCE SHALL STATE! " THE BUILDING HAS <br />RECEIVED A COMPLETE "TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES, <br />THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS OF TNT= <br />FLCR'DA DEPARTMENT CAF AGRICULTURE AND CONSUMER SERVICES, <br />14) AFTER ALL WORK 15 GOM1PLETE LOOSE WOOD AND FILL MUST BE REMOVED FROM <br />CELOW AND WITHIN 1' -0" COF TrtE BUILDING. THi5 INCLUDE5 ALL GRADE 5TAK €5,TUB <br />TRAP BOXES, FOR M5,5H!OR1N!s OR OTHER CELLULOSE CONTAINING MATERIAL. <br />i5) NO WOOD , VEGETATION, STUMPS, CARDBOARD ,TRASH ETC. , SHALL BE BURIED WITHIN <br />V -0" OF ANY BUILDING (!OR PROPOSED BUiLD1NG <br />THE FLORIDA PRODUCT APPOVAL <br />NUMBERS ARE LOCATED iN THE <br />AREAS THAT THE PRODUCT 15 <br />GOING TO BE USED. <br />DATE : <br />9/21/11 <br />NO <br />SCALE <br />DESIGN SERVICES ING, <br />�\ MOBILE/ OFFICE 352 -20ro -5827 <br />-- -- - - OFFICE FAX 352 -588 -2342 <br />R. S, HANLEY P O BOX 1325 SAN ANTONIO <br />FLA. 33576 <br />EMAIL: hanley06�embargmail,com <br />BECAUSE THiS 15 AN ADDITION IT WILL BE THE RESPONSIBILITY <br />OF ALL SUBS AND SUPPLIERS TO VERIFY ALL INFORMATION IN <br />THE FIELD BEFORE ORDERING ANY MATERIAL OR STARTING <br />ANY WORK, THE HOMEOWNER REQUIRES THAT TH15 ADDITION <br />MATCHES THE EX16TNG HOUSE, IF ANY INFORMATION 15 NOT ON <br />THiS PLAN THE CONTRACTOR WiLL NEED TO VERIFY THAT THE <br />NEW WORK 15 MATCHING THE EXISTING, <br />MASONRY WALLS <br />#1 CONRETE MA60NARY UNiT SHALL BE HOLLOW UNIT <br />MASONARYIN ACCORDANCE WITH ASTM C -W AND SHALL <br />HAVE MINIMUM F'M OF 1500 <br />02 MORTAR SHALL CONFORM TO ASTMC -270 AND SHALL BE <br />EITHER TYPE M OR S. <br />03 REINFORCING STEEL SHALL BE GARAGE 40 MINIMUM AND <br />IDENTIFIED IN ACCORANCE WITH ASTMA- 615,LAP SPLICES <br />WHERE REQUIRED SHALL BE A MiNIMUM OF 25" FOR #5 REBAR <br />301' FOR #6 REBAR AND 36" FOR #7 REBAR. <br />04 GROUT FOR POURED CELLS AND LINTELS SHALL HAVE A <br />MAXIMUM COURSE AGGREGATE SIZE OF 3/8" PLACED AT 8 TO <br />it INCH SLUMP AND HAVE A MINIMUM 28 DAY COMPRESSIVE <br />STRENGTH OF 3000 P.S.I, ( WHEN TESTED PER ASTM C -1019) <br />#5 PROVIDE CLEAN OUT OPENINGS (12 50 IN,) IN CELLS <br />CONTAINING SPLICED REINFORCEMENT. WHEN THE GROUT <br />POUR EXCEEDS 5 FEET IN HEIGHT, <br />FOUNDATION ANDS SLAB NOTE <br />#i THE BUILDING SITE SHALL 1SE SCRAPED TO REMOVE <br />ALL ORGANIC MATERIALS. ANY ADDITIONAL FILL PLACED ON THE <br />BUILDING PAD AREA SHALL BE COMPACTED SUCH THAT IT CAN <br />ADEQUATELY SUPPORT A 2000 P.S.F, FOUNDATION LOADING. <br />THE SLAB SHALL BE PLACED OVER A &MIL VAPOR BARRIER ON <br />CLEAN ADEQUATELY COMPACTED AND TERMITE POISONED SOIL, <br />THE CONCRETE UTILIZED IN THE FOUNDATION AND SLABS SHALL <br />HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3000 P.S.I. <br />#2 REINFORCING STEEL SHALL 15E GRADE 40 MINIMUM AND <br />IDENTIFIED IN ACCORDANCE WITH ASTM A -615. LAP SPLICES, WHERE <br />REQUIRED SHALL BE A MINIMUM OF 25" FOR #5 REBAR, 30" FOR #6 <br />REBAR AND 35" FOR #7 REBAR. <br />CROSS SECTION <br />JOB NAME AND ADDRESS: <br />NATHANIEL and ASHLEY NEW80N <br />5903 9th ST, ZEPHYRHILLS, FLORIDA 33542 -3612 <br />GREAT ROOM 512 SF <br />VERIFY ALL CONDITIONS AND SF BEFORE <br />BIDDING OR CONSTRUCTION <br />DAVID W. SMiTH, MS. PE, <br />FLORIDA LiC.# 53000 <br />352 - 521 -0805 OFFICE 352 - 521 -08o7 FAX, <br />9c309 WALLA5TON DRIVE DADE CITY FLA. 33525 <br />I HEREBY CERTIFY THAT I HAVE REVIEWED THIS <br />PLAN AND FOUND IT TO BE iN COMPLIANCE WITH <br />,45CE -7, THE FLORIDA BUILDING CODE 2007 EDITION <br />AND THE 2009 SUPPLEMENTS WITH ALL REVISIONS <br />AND UPDATES TO F15C -07, <br />DAVID W. SMITH MS, PE. # 53608 <br />