Laserfiche WebLink
CG12-016 RADIANT ZH <br /> ADDITIONAL COMMENTS/NOTES: <br /> ITEM sl: <br /> t NONE <br /> OTHERITEMS <br /> OUR ANALYSIS DOES NOT SERVE TO QUALIfYAL1 COMPONENTS OF THE EXISTINCi MA/N STRUCTURAL SUPPORT SYSTEM AND SHALL ONLY <br /> APPLY TO THE AREA 1N THE IMMEDIATE VICINITY OF THf OBSERVED AREA. <br /> DISCLAIMER: <br /> In the Consultant's Construction-phase services,it is understood that the Contractor,NOT TI-IE CONSiJLTANT,is responsible for the <br /> construction of the project and the Consultant is not responsible for the acts or omissions of any oontractor,sub�ntractor,or material <br /> supplier;for safety precautions,programs,or enforcements;or for oonshudion means,methods,techniques,sequences and procedures <br /> employed by the Contractor. <br /> The Engineer of Reoord(EOR)(if other than CGCE)is ultimately responsible for the overall design of the project. If any part of the <br /> designs proposed by our offices directly impacxs the work of the original EOR,the EOR shall be immediately notified in writing by the <br /> Contractar of the poternial impact. <br /> ALL INSTALLATIONS.AS APPLICABLE.SHALL 8E MADE 1N ACCORDANCE WITH THE GUIDELINES AS SPECIFIED IN THE FBC2007REV09 BUILDING <br /> CODE.ASTM STANDARDS AND ALL APPLICABLE LOCAL GODES. <br /> - 2- <br />