Laserfiche WebLink
CG12-016 RADIANT ZH <br /> AQDITIONAL COMMENTS/NOTES. <br /> (TEM �I: <br /> 1 NONE <br /> OTHER ITEMS <br /> OUR ANALYSIS DOES NOT SERVE TO QUALIFY ALL COMPONFNTS OF THE EXISTfNQ MAIN STRUCTURAL SUPPORT SYSTEM AND SHALL ONlY <br /> APPLY TO THE AREA IN THE IMMEDIATE 1/!C!NlTY OF THE OBSfRVED AREA. <br /> DISCLAIMER: <br /> In the ConsultanYs Construction-phase services,it is understood that the Contractor,NOT THE CONSULTANT,is responsible for the <br /> construction of the project and the Consultant is not responsible for the ac�ts or omissions of any contractor,subrnntracxor,or material <br /> supplier;for safety precautions,prograzns,or enforcements;or for oonstruction means,methods,techniques,sequences and procedtmes <br /> employed by the Cont�actor. <br /> The Engineer of Record(EOR)(if other than CGCE)is ultimately responsible for the overall design of the projed. If any part of the <br /> designs proposed by our offices directly impacts the w�lc of the original EOR,the EOR shall be immediately noti8ed in writing by the <br /> Contractor of the poternial impact. <br /> ALL JNSTALLATIONS,AS APPLICABLE.SHALL BE MADE IN ACCORDANCE WITH THE GUIDELlNES AS SPECIFIED!N THE FBC2007REV09 BUIlDING <br /> CODE.ASTM STANDARDS AND ALL APPLICABLE LOCAL CODES <br /> - 2- <br />