Laserfiche WebLink
CG12-016 RADIANT ZH <br /> ADDITIONAL COMMENTS/NOTES: <br /> ITEM �I: <br /> I. NONE <br /> OTHER ITEMS <br /> OUR ANALYSIS DOES NOT SERVE TO QUAUFYALL COMPONENTS OF THE EXISTINO MA/N STRUCTURAL SUPPORT SYSTEM AND SHALL ONLY <br /> APPLY TO THE AREA IN THE tMMEDfATE VlCINITY OF THE OBSERVED AREA. <br /> DISCLAIMER: <br /> 1n the Consultant's Construction-phase services,it is imderstood that the Contractor,NOT TI�CONSULTANT,is responsible for the <br /> construction of the project and the Consultant is not resperosible for the acts or omissions of any oontractor,subcontractor,or material <br /> supplier;for safety precautions,programs,or enforcements;or for construction means,methods,techniques,sequenoes and procedures <br /> employed by the Contractor. <br /> The Engineer of Record(EOR)(if other than CGCE)is uldmately responsible for the overall design of the pmject. If any part of the <br /> designs proposed by ow offices directly impacts the work of the original EOR,the EOR shall be immediately notiSed in writing by the <br /> Contractor of the potential impact. <br /> ALL INSTALLATIONS,AS APPLICABLE SHAlL BE MADE IN ACCORDANCE 1C/ITH THE GUIDELINES AS SPECIFIED IN THE FBC2007REV09 BUILDING <br /> CODE,ASTM STANDARDS AND ALL APPUCA8IE LOCAL CODES <br /> - 2- <br />