Laserfiche WebLink
Jacqueline Boges <br /> From: Bill Burgess <br /> Sent: Monday, April 23, 2012 10:18 AM <br /> To: Shane LeBlanc <br /> Cc: Jacqueline Boges <br /> Subject: Ciry Hall/Library-A/C and Lighting <br /> Deficiencies noted during final inspection: <br /> 1. Curbs on three roof top units do not cover existing transition to roof material. <br /> 2. Test and Balance required per notes on approved plan. <br /> , 3. New disconnect attachments need correction as discussed. <br /> 4. Breakers and fuses to match manufactures requirements on new A/C units <br /> 5. Electrical Panels and A/C units shall be matched and labeled for identification purposes. <br /> " 6. Library circuits to be traced and identified to ensure wire size and circuit breakers are to code. <br /> 7. Two of the library units were specified to be single-phase but were supplied by existing three—phase and a leg <br /> was removed to accommodate.This should be addressed and approved by the engineer of record. <br /> 8. Heat strips above Utility Department to be connected. <br /> It is my understanding the engineer called for a simple A/C change-out without additional electrical work, <br /> unfortunately code requirements prevail. <br /> i <br />