My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12915
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-12915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 11:46:43 AM
Creation date
2/12/2013 11:46:42 AM
Metadata
Fields
Template:
Building Department
Company Name
WALMART
Building Department - Doc Type
Permit
Permit #
12-12915
Building Department - Name
WALMART
Address
7631 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma r, 2b. 2012 10'04AM No, 2624 P, 4 <br /> In the event of any dction or proceeding brought by either patty against the other under this Contract, the <br /> prevailing party will be entitled to recover all costs and expenses,including court costs and reasonable attorneys'fees. <br /> 36. EXHIBfTS. <br /> Intentionally Omitted <br /> 3'7 DEFAUl.T. <br /> The occasion of a default, breach or an event which with the passage of time,giving of notice or either of them <br /> would constitute a default, In any of the terms or obligations of Contractor under another contract or agreement with <br /> Wal-Mart, or any subsidiary,division or affiiiate of Wal-Mart,shall constitute an event of default hereunder, whereupan <br /> Wal-Mart shall have the right to pursue such remedies as are provided for herein or at law or in equity, concurrently, <br /> cumulatively or successively against Contractor unt;l afl damages arising by reason of such default have been paid in full. <br /> 38. CONTROL OF PERSONNEL. <br /> Notwithstanding any provision in this Contract to the contrary,Wal-MarY does not assume responsibility for the <br /> conerol of the construction personnel of the Contractor, for assuring compliance by ConCractor with the obligations set <br /> forth hereln, or for implementation and enforcement of such obligatlons, all of whlch shall remain solely and exclusively <br /> the responsibility of the Contractor, and Wal-Mart shall not be deemed ta be a joint employer of any employees of <br /> Contractor by v;rtue of any of the terms and conditions hereof. <br /> Contractor: �f�I� l��qrl��cro-� Print Name: �1"/'� CK /v l �� �'�� <br /> BY' 7itle: G n 9 <br /> oate: � � � � f 2 <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.