Laserfiche WebLink
THE STANDARDS AND GUIDELINES SET IN BID SPECIFICATIONS 2011 <br /> rtJNLESS OTHERWISE NOTED, ALL WORK IN THIS WRITE-UP TO FOLLOW <br /> SPEC # DESCRIPTION OF THE WORK LOCATION COST <br /> 75 CABINETS - HITCHEN/COUNTER TOP <br /> Provide and install new pulls and handles. Color to be nickel. Kitchen 50 <br /> Re-caulk counter top. Kitchen 15 <br /> 78 ELECTRICAL <br /> Install new hardwired smoke detectors and <br /> combination smoke/carbon monoxide detectars. To Code 490 <br /> Install a new ceiling light kit. Assume <br /> the cost of the light fixture to be $35.00. M. Bedroom 60 <br /> Furnish and install a new ceiling hugger or extension bar <br /> fan with light kit. Assume cost of fan and light kit at <br /> $95.00. Include new fan box if required. Bedrooms (2) 340 <br /> Re-lamp all new and existing fixtures with standard <br /> energy efficient bulbs. Recessed lighting to receive <br /> R-30 energy efficient bulbs. Entire House 65 <br /> 79 H.V.A.C. <br /> Provide standard maintenance/service to the existing air handler& <br /> condensing unit. Include coil cleaning and new filters in price. <br /> Provide documentation if unit needs repair. Interior 265 <br /> 80/81 PLUMBING-GENERAL SPECIFICATIONS <br /> PLUMBING FIXTURES <br /> Install a new heavy duty stainless steel double compartment deep <br /> bowl sink. Sink shall be installed complete with supplies, faucets, <br /> fittings, traps, etc.. Supplies must be equipped with stop valves. Kitchen 400 <br /> Furnish and install a new 1/2 H.P. garbage disposal. Kitchen 155 <br /> PAGE TOTAL: 1840 <br /> CUM TOTAL: 4880 <br /> CASE #: 10-6483 7539 Merchantville DATE: 03/08/12 PAGE: #5 <br /> Rev.3/10/11 <br />