My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12931
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-12931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 12:00:23 PM
Creation date
2/12/2013 12:00:20 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
12-12931
Building Department - Name
WORK FORCE HOUSING VENTURES INC
Address
5202 17TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE STANDARDS AND GUIDELINES SET IN BID SPECIFIC:ATIONS 2011 <br /> UNLESS OTHERWISE NOTED, ALL WORK IN THIS WRITF-UP TO FOLLOW <br /> SPEC # DESCRIPTION OF THE WORK LOCATION COST <br /> 49 GUTTERS AND DOWNSPOUTS <br /> Install new 6" seamless gutters and downspouts at <br /> all eaves where water runoff from the roof occurs. <br /> Leaders and downspouts to be 3"X 4" with splash <br /> blocks included in the price. White. Entire House 700 <br /> 50/51 ROOFING-GENERAL SPECIFICATIONS <br /> ROOFING-FIBERGLASS SHINGLES <br /> Remove the existing roofing material and old felts. <br /> Replace any deteriorated wood framing and sheathing <br /> (see spec No. 28). Install a new 30 year dimensional <br /> shingle roof per all requirements of the specifications <br /> and applicable codes. Shingles to be Tamko Heritage 30 <br /> or equal. The secondary water barrier is peel and stick. <br /> Note: Existing lx2 drip board may be removed <br /> when new fascia& soffit is being installed. <br /> The contractor to submit the roofing inspection affidavit <br /> upon the completion of the project. Include installing <br /> ridge vents at all peaks. Re-nail the deck to meet code Entire House 3200 <br /> Contractor to notify the Housing Specialist at the time <br /> of roof installation so pictures, of the substrate and water <br /> barrier installation, can be taken to verify compliance of <br /> specifications. Failure to notify could result in the roofing <br /> being rejected. Info Onl;y Info Only <br /> 53 ROOFING-ROLL ROOFING <br /> Remove the existing roofing materials at dead level flat roof <br /> areas. Replace any deteriorated wood framing and sheathing. <br /> (See Spec. No. 28) Re-sheath and install new built-up roof <br /> per specifications. The secondary water barrier is peel and stick. <br /> Flashing installed as required to pitched roof <br /> areas. Re-nail the roof deck to code. Flat Roof 1400 <br /> Contractor to notify the Housing Specialist at the time <br /> of roof installation so pictures, of the substrate and water <br /> barrier installation, can be taken to verify compliance of <br /> specifications. Failure to notify could result in the roofing <br /> being rejected. Info Only Info Only <br /> PAGE 7'OTAL: 5300 <br /> CUM TOTAL: 8425 <br /> CASE #: 10-6456 5202 17`n St. DATE: 03/08/12 PAGE: #2 <br /> Rev.3/10/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.