Laserfiche WebLink
THE STANDARDS AND GUIDELINES SET IN BID SPECIFIC:ATIONS 2011 <br /> UNLESS OTHERWISE NOTED, ALL WORK IN THIS WRITF-UP TO FOLLOW <br /> SPEC # DESCRIPTION OF THE WORK LOCATION COST <br /> 49 GUTTERS AND DOWNSPOUTS <br /> Install new 6" seamless gutters and downspouts at <br /> all eaves where water runoff from the roof occurs. <br /> Leaders and downspouts to be 3"X 4" with splash <br /> blocks included in the price. White. Entire House 700 <br /> 50/51 ROOFING-GENERAL SPECIFICATIONS <br /> ROOFING-FIBERGLASS SHINGLES <br /> Remove the existing roofing material and old felts. <br /> Replace any deteriorated wood framing and sheathing <br /> (see spec No. 28). Install a new 30 year dimensional <br /> shingle roof per all requirements of the specifications <br /> and applicable codes. Shingles to be Tamko Heritage 30 <br /> or equal. The secondary water barrier is peel and stick. <br /> Note: Existing lx2 drip board may be removed <br /> when new fascia& soffit is being installed. <br /> The contractor to submit the roofing inspection affidavit <br /> upon the completion of the project. Include installing <br /> ridge vents at all peaks. Re-nail the deck to meet code Entire House 3200 <br /> Contractor to notify the Housing Specialist at the time <br /> of roof installation so pictures, of the substrate and water <br /> barrier installation, can be taken to verify compliance of <br /> specifications. Failure to notify could result in the roofing <br /> being rejected. Info Onl;y Info Only <br /> 53 ROOFING-ROLL ROOFING <br /> Remove the existing roofing materials at dead level flat roof <br /> areas. Replace any deteriorated wood framing and sheathing. <br /> (See Spec. No. 28) Re-sheath and install new built-up roof <br /> per specifications. The secondary water barrier is peel and stick. <br /> Flashing installed as required to pitched roof <br /> areas. Re-nail the roof deck to code. Flat Roof 1400 <br /> Contractor to notify the Housing Specialist at the time <br /> of roof installation so pictures, of the substrate and water <br /> barrier installation, can be taken to verify compliance of <br /> specifications. Failure to notify could result in the roofing <br /> being rejected. Info Only Info Only <br /> PAGE 7'OTAL: 5300 <br /> CUM TOTAL: 8425 <br /> CASE #: 10-6456 5202 17`n St. DATE: 03/08/12 PAGE: #2 <br /> Rev.3/10/11 <br />