My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12939
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-12939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 12:43:43 PM
Creation date
2/12/2013 12:43:42 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
12-12939
Building Department - Name
RANDY CAMP
Address
3443 PYRITE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
la - o � <br /> � <br /> Procedure for Lot Improvement Requests <br /> (Please refer to "Rules and Regulations') <br /> 1, All requests are to go to Chairman of the Property Evaluation Committee, for the comm.ittee <br /> to review. There is a holder lsbeled "Pronert,Ev,a�n &Iwmrow,�e�uts"in the linrv <br /> for Lot ow►a�ers.to nlaoe t�ir'co�ni�ted fer�.s�a�d tkae fonrs w►HI be o�i�ed�n fi� <br /> __ .. _.. <br /> ttie L�riuv bv t�Pr�erlv Ev�o�co�itt� <br /> 2. Any requ�e.st which is NOT filled out properly or in detail, which includes, complete plan <br /> layout, elevations (where applicable), written deTai�s of improvement being requested,including <br /> color, etc,and aay other information pertinent to thc prooessing of the reque.st,w►�be re�rs�d <br /> t2�te Lot aw�r f�co be�br�e bei��ed b,�,►t6c Come�ittee. <br /> 3. Committee wiil review requests and visit the site of the request as necessary.. <br /> 4• After the Committee has approved or denied the request, it will be presented to the Board of � <br /> Directors for their appr�val or denial. � <br /> , <br /> 5. There will be NO more one day approvals or last minute approvals. Request will take 7- 14 <br /> days for appropriate review�nd consideration, thus giving the Committee and Board mcmbers <br /> time to review and consider the raquest in a thorough maaner. <br /> 6. The original request will be stamped approved or denied, and aRer being copied the original <br /> v�ill 8o into to the membeis file and the copy returned to the Loi owner by the Board of Director <br /> liaison to the committee. <br /> 7. The committee will follow up on requests to deternune that the request as presented and <br /> approved is being adhered to. <br /> As the owner of Lot# 2 I understand the Property Evaluation Committee and/or the <br /> Board of Directors wi11 enter the property to follow the cxtemal progress vf the cc,nstru�tion or <br /> �mP1'ovement,as submitted on the Lot Improvement Request. <br /> ? <br /> �� . � 3-r�-/z <br /> t Own s signa�ure Da� <br /> 4/03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.