Laserfiche WebLink
! <br /> NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "d6ed" restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORB AND CONTRlACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> eontractors to undertake work, they may be requfred to be Iicensed fn accordance with state and local regulations. If the <br /> contractor fs not licensed as required by law, bpth the owner and contractor may be cited for a misdemeanor vivlativn <br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work, they are advised to contact the Pasco County Building Inspectian Division—Licensing Section at 727-847- <br /> 8009. Furthermo�e, if the owner has hired a 'contractor or contractors, he is advised to have the contractor(s) sign <br /> cont�ctorf thatYmay betanBndication that he'ifs niot p�operly Iicensedi�and is not enttled to permitting privilegesgn Pasco <br /> Counry. <br /> TRAI�SPORTATION IMPACT/UTILITIES IMPA�7 AND RESOURCE RECOVERY FEES: The undersigned unde�stands <br /> that Transportation Impact Fees and Recourse F�ecovery Fees may apply to the construction of new buildings, change of <br /> use in existing buildings, or expansion of existing buildings, as spec(fied in Pasco County O�dinance number 89-07 and <br /> 90-07, as amended. The undersig�ed also understands, that such fees, as may be due, will be identified at the time of <br /> perrrtitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "certificate vf occupancy" or final power release. If the project does not involve a certfflcafe of occupancy or <br /> flnai power release, the fees must be pafd prior to permit issuance. Furthermo�e, if Pasco County Water/Sewer Impact <br /> fees are due, they must be pafd prior to permit issuance in accordance with applicable Rasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida 3tatutes, as amended): If valuation of work is $2,500.00 or more, I <br /> certify that i, the applicant, have been provided with a copy vf the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owne�", I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner" prior to commencement. <br /> CONTRACTOR'SIOWNER'S AFFIDAVIT: I centify that all the (nformation in this application is accurate and th�t ail work <br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Appiication is <br /> hereby made to obtafn a permit to do work and instailation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and that ail work wfll be performed to meet standards of all laws regulating <br /> consCruction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I aiso <br /> ce�tify tt�at I understand that the regulatians of other government agencies may apply to the intended work, and that it is <br /> my responsibility to Identify what actions I must take to be in complfance. Such agencfes include but are not limited to: <br /> - Depa�tment of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands, Water/Wastewater Treatment. <br /> - Southwest Florida Water Management Dfstrict-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> ' Watercourses. <br /> - Army Corps of Engineers-Se�walls, Docks, Navigable Waterways. <br /> - Department of Health 8� Reh�bilitative Services/Environmentai Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> � - US�Environmentai Protection Agency-Asbestos abatement. <br /> Federal Aviation Authority-Runways. <br /> i understand that the following restrfctfoFlS apply to the use of flll:� <br /> Use of flll is not allowed in Flood Zone"V" uniess expressly permitted. <br /> If the fill material is to be used in Flood Zone °A", it is understood that a drafnage•pian addressing a <br /> "compensattng volume" will be submitted at time of permitting which is prepared by a,professfonal engineer <br /> Iicensed by the State of Florida. <br /> - if the fill material is to be used in Flood Zone "A" in connectfon with a permitted building using stem wali <br /> const�uction, I ce�tify that fill will be used oniy to fill the area within the stem wall. <br /> If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of ffll is found to �dversely affect adJacent prope�ties, the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which are elevated by fill, an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER, I promise in good faith to fnform the owner of the permitting conditions set forth in <br /> this affidavit privr to commencing construction. I understand that a separate permit may be required for electrical work, <br /> piumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically ihcluded in the application. A <br /> permit issued shail be constn.ied to be a license to proceed with the work and not as authority to,violate, cancel, alter, or <br /> set aside any provisions of the technicai codes, nor shall issuance of a permit prevent the Bu(Iding Official from thereafter <br /> requiring a correctfon of errors in plans, construetion or violations of any codes. Every permit issued shall become invalid <br /> unless the work 8uthorized by such permit is commenced within six months of permit issuance, or if work authorized by <br /> the permit is suspended or abandoned for a period of s(x(6)months after the time the work is commenced. An extension <br /> may be requested�the e�xtension. f work icefa e�forininety(90)rcon ecutive days, th�job is�c ns de ed bia d nedstrate <br /> justifiabie cause fo <br /> W A R N I N G T O O W N E R: YOUR �AILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE FOR IMPROVEMENT3 TO YC�UR PRQPE l�T Y. I F Y O U I N T E N D T O O B T A I N F I N AMENT.' C O N S U L T <br /> ('AMME�ICE <br /> WITH YOUR LENDER OR AN ATTORNEY BE�ORE RECQRDING YOUR NQTICE OF - <br /> FLORIDA JURAT(F.S.11 . 3) ,. � � r �J <br /> OWNER OR A(3ENT. ' CONTRACTU � <br /> Subsc.�ibed and swo o(or aflirmed)before me this Subscrlbed and s m to(or afflrmed)be re me this <br /> b bY <br /> VYho is/are personaliy knovm to me or has/have produced Who I nally known to me or has/h ia�ve���on. <br /> asidenUflcatlon. <br /> Notary Pubiic <br /> Notary Public <br /> Commisslon No. Commisslon No. ' <br /> ed, rinted or stamped Name of Notary typed,printed or stamped <br /> Name of Notary typ P <br />