Laserfiche WebLink
SPEC# DESCRIPTION OF THE WORK LOCATION COST <br /> 88 PAINTING GENERAL SPECIFICATIONS CONTINUED <br /> After all repairs to cracks have been completed and the crack <br /> filler material has cured properly, pressure wash the walkways <br /> and driveway, back porch to remove all stains, mildew and any <br /> foreign matter. By following the paint manufacturers preparation <br /> instructions, prepare the surfaces for the application of an epo� <br /> paint. When a11 paint manufacturing preparation instructions have <br /> been completed, apply epoxy paint to a11 prepped surfaces Back Porch/ <br /> following paint manufacturers application recommendations. Driveway/ <br /> Housing Specialist to review manufacturers spec's prior to Walkways/ <br /> painting. Exterior <br /> Pressure clean all sidewalks, walkways, slabs, <br /> aprons, driveway, walkway and front porch. Info Only Info Only <br /> 88 LANDSCAPING <br /> Install landscaping in the front yard as directed <br /> by the Housing Specialist. The allowance for this item. Front Yard $400.00 <br /> 90 MAIL BOX <br /> Furnish and install a new mail box to our bid specs. Exterior <br /> 94 MISCELLANEOUS <br /> Furnish and install new address numbers to code. Front <br /> PAGE TOTAL• <br /> PROJECT EXTERIOR TOTAL: <br /> INTERIOR WORK <br /> 19 FLOOR COVERING/CARPET <br /> After the removal of existing flooring, install new carpeting to <br /> manufacturers instructions. The carpet shall be (30) ounce, stain <br /> resistant over a minimum of 1/2 inch re-bond, FHA approved. <br /> The installation sha11 be in an approved manner. All tack strips, <br /> metal accessories, etc., are included in this specification. T'he <br /> carpet sha11 be first quality, no seconds will be accepted. Product <br /> documentation will be provided by the contractor prior to Florida Room/ <br /> NAME: CASE#10-6477 3'�Ave. DATE: 05/13/12 PAGE: <br />#5 <br /> Rev.3/10/11 <br />