Laserfiche WebLink
SPEC# DESCRIPTION OF THE WpRK LOCATION COST <br /> and electrical and copper to code. Minimum SEER required- 15.0, <br /> 7.5 KW heat strip. Heat pump air cooled condensing unit set on a <br /> concrete(or equal) pad. A.H. unit to be installed in attic space with <br /> access, to code. Perform proper test and balance at completion. <br /> Contractor is responsible for proper sizing of <br /> a11 new equipment and <br /> ductwork with the exception of the 7.5 KW <br /> heat strip. Note: New <br /> thermostat to be a programmable, Energy Star qualified product. Entire House <br /> Include eliminating e�sting wall return ducts and relocating/adding <br /> supply and return drops as required. New <br /> rmostat to be centrally <br /> located between new ceiling returns. <br /> Info Only Info Only <br /> PAGE TOTAL: <br /> CiJM 7'OTAL• <br /> 79 H.V.A.C. CONTIl�TUED <br /> Furnish and install a new recessed dryer vent box and etchaust <br /> duct/vent to code. Garage <br /> 80/81 PLUMBINGGENERAL SPECIFICATIONS <br /> PLUMBING FIXTURES <br /> Install a new heavy duty stainless steel double compartment deep <br /> bowl sink. Sink shall be installed complete with supplies, faucets, <br /> fittings, traps, etc.. Supplies must be equipped with stop valves. Kitchen <br /> Provide a11 plumbing connections for new dishwasher. <br /> Include a new copper water line complete with Hanson <br /> type shut-off valve for icemaker. Kitchen <br /> Furnish and install a new 1/2 H.P. garbage disposal. Kitchen <br /> Furnish and install a new tub, drains, plumbing, <br /> shower head and faucet. Hal1 Bath <br /> Furnish and install new pan, faucet, plumbing <br /> drain and shower head for the shower. Master Bath <br /> Install a new elongated toilet complete with new <br /> supply line and angle stop with new escutcheon. Bathrooms <br /> Connect new vanity lavatory with new <br /> NAME: CASE #11-6071 39241 8'�'Ave. DATE: 06/ll/12 PAGE: #11 <br /> Rev.3/10/i l <br />