NOTICE OF DEED RESTRICTIONS The undersigned understands that this permit may be subject to"de��d"restrictions" •
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES If the owner has hired ,a contractor or
<br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misderrieanor violation
<br /> under state law If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009 Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block"of this application for which they will be responsible If you, as the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new build ngs,change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended The undersigned also understands,that such fees,as may be due,will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy"or final power release if the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordin<3nces.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended) If valuation of work is$2,5C10 00 or more, I
<br /> certify that i, the applicant, have been provided with a copy of the "Florida Construction Lien Law--Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs if the applic.ant is someone
<br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner'prior to commencement.
<br /> CONTRACTOR'SlOWNER'S AFFIDAVIT I certify that ali the information in this application is accurate and that all work
<br /> will be done in compliance with ali applicable laws regulating construction,zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other govemment agencies may appiy to the intended work,and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentaliy Sensitive
<br /> Lands,Water/WastewaterTreatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland P,reas, Aitering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalis,Docks,Navigable Waterways.
<br /> - Department of Health 8 Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> - If the fili material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction,I certify that fill will be used oniy to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely ;affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fiil,an engineered drainage plan is required
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditi�ns set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air co�ditioning, gas, or other instailations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alYer,or
<br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Offlcial from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shail become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety(90)days and wall demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER. YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU iNTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YOUR LENDER OR AN OR EY BEFORE RECORDING YOUR NO ICE OF CEMENT.
<br /> FLORIDA JURAT(F.S 117. —
<br /> OWNER OR AGENT CONTRACTOR
<br /> S b cr�pg nd s,wrnjo�or afyrmed)b,��Pr�e e this �i+ r e and swomty�p�r affy' ed befoS�{�ey�is
<br /> lY!�� by M.G_Cfi/1 .aYr1�I�4 V��by /KCaC�fA) JYMiY��---_
<br /> Who lare per�onally known to me or has/have produced Who�/are per onally knovm to me or haslhave produced
<br /> �I�� as identification as identification.
<br /> Notary Pub6c tJotary Pubhc
<br /> ommission No Co mission No
<br /> ��Y`le-< 'i1r��-1v� �',al�r1'l���1�'a rva���
<br /> �q� ta�y�W.r.wyy��t�c�t�Qped Name of Notarytyped, �� m����y�Y:'�aLl�
<br /> P"lJ 9
<br /> ; �✓'' . �'S74>��U��F�.:?�:?'..', _ ",�}�o ,�S?'i�'➢`��!�r��:%�;a,.�,
<br /> R�� ; ��.;�,.!
<br /> , �C�aYS�utiYE�O'd7lk�'e' ' �'L°�wa9�ni;2��C:'��f},��1'
<br /> +t� �;�;ir�;s'�G(2512:)`d�> �� c::pir,���0/��/�� 'I
<br />
|