Laserfiche WebLink
Supporting Documents <br /> A Drav��in� <br /> 1 Drawii�D No. FL (�065.14 prepared by R V1�Building C�nsultants_ Inc (Flor�da Board of <br /> Professionaf Gn<�ineers Ceirtificate ofAuthorization No 9S13)signed and sealed by Lyndon <br /> F Schmidt, P E� <br /> B Tests Performed <br /> 1 Testin�per TAS 202-94 as performed by Architectural Testing, Inc. and reported in test <br /> repoi�t nuniber ATI 01-4445; O1,si��ed by Joseph A. Reed, P.E. <br /> 2 Plastics testii�g in accordance with tlte"High Velocity Hurricane Zone"substantiated by <br /> issuance of Miami-Dade Notice of Acceptance 07-0918.10. <br /> C Calculations <br /> 1. Product anchoring�s in accordance with manufacturer's published recommendations as <br /> substantiated by tested specimens reported in test report iwmber AT'] Ol-44453.01. <br /> 2. Buch al�chor analysis for loading conditions;prepar�d,signed and sealed by Lyndon F. <br /> Schmidt, P.E. <br /> 3 Glass Load Resistance Report ASTM E]300 prepared by Lyndon F Schmidt,P.E. <br /> D Other <br /> 1. Certificate of Paiticipation issued by Window and Door Manufacturers Association, <br /> certifi�ing that Silverline Building Products is manufacturing products within a qualiCy� <br /> assurance pro;ram that complies:��itll ISO/IEC 17020 and Guide 53 <br /> � I '-�—� <br /> Lyndon F. Schmidt,P E. <br /> FL No.43409 <br /> January 2S,2009 <br /> PF 1449 Sheet 3 01'3 <br />