. NOTICE OF DEED RESTRICTIONS The undersigned understands that this permit may be subject to 'deed"restrictions"
<br /> which may be more restrictive than County regulations The undersigned assumes responsibility for compliance with any
<br /> • applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES. If the owner has hired a contractor or
<br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misd'emeanor violation
<br /> under state law If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work,they are advised to contact the Pasco County Bwiding Inspection Division—Licensing Section at 727-847-
<br /> 8009 Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Biock"of this application for which they will be responsible If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance rwmber 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees mu:st be paid prior to
<br /> receiving a "certificate of occupancy'or final power release. If the project does not invoive a certificatf:of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due,they must be paid prior to permit issuance in accordance with appiicable Pasco County ordinances
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended) If valuation of work is$2 500 00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs If the appdicant is someone
<br /> other than the"owner" I certify that I have obtained a copy of the above described document and promi;;e in good faith to
<br /> deliver it to the"owner"prior to commencement
<br /> CONTRACTOR'SlOWNER'S AFFIDAVIT I certify that all the information in this app�ication is accurate and that ali work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work wifl be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the�urisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance Such agencies include but are not limited to
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environrrientally Sensitive
<br /> Lands,Water/Wastewater Treatment
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altenng
<br /> Watercourses
<br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> - Department of Health 8 Rehabilitative Services/Environmental Health Unit-Wells, Wastevvater Treatment,
<br /> Septic Tanks.
<br /> - US Environmentai Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> - If the fill materiai is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction. I certify that fill will be used only to fill the area within the stem wall.
<br /> - if fill material is to be used m any area, I certify that use of such fi�l will not adversely affect adjacent
<br /> properties If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots le�ss than one (1)
<br /> acre which are elevated by fill,an engineered drainage plan is reqwred
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting condi�ions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commencecl. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety(90) days and v✓ill demonstrate
<br /> �ustifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY ESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY IF YOU INTEND TO OBTAI CING,CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF CEMENT.
<br /> FLORIDA JURAT(F.S 117.03)
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to(or aKrmed)before me this
<br /> b b rib and swQ�(�,t,o,(�r ffirmed)befor me tpis
<br /> Y � ��bv r�!��'f\.N �41�.15 a►
<br /> Who is/are personally known to me or has/have produced Who is/are personally known to me o as/ha produced
<br /> as idenhficahon
<br /> as identifcaUOn.
<br /> Notary Pubhc , �//1�1 Notary Pubhc
<br /> Commission No
<br /> C m ission No
<br /> Name of Notary typed,printed or stamped Name of Nota ed, nnted or stamped `Jti`�;,0 9f,,—��vt@LANIE JOHNSON
<br /> �Y bP P ` P �
<br /> ;�. .�:, Notary Public-State of Florida
<br /> _•: ; •;: My Comm. Expires Apr 20,2015
<br /> "`'�` '� Commission#EE 74567
<br /> '�'lF OF F�OP�
<br /> �""�������" Bonded Through National Notary Assn.
<br />
|