My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13317
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2013 9:35:15 AM
Creation date
7/1/2013 2:44:34 PM
Metadata
Fields
Template:
Building Department
Company Name
CROWN CASTLE GT COMPANY LLC
Building Department - Doc Type
Permit
Permit #
12-13317
Building Department - Name
CROWN CASTLE GT COMPANY LLC
Address
38522 A AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Crown Castle USA, Inc. July 16, 2012 <br /> 285 Ft Self Support Tower Structural Analysis CCI BU No 816298 <br /> Project Number 012-01232-00,Application 144090, Revision 1 Page 11 <br /> 5) DISCLAIMER OF WARRANTIES <br /> SSOE Group has not perFormed a site visit to the tower to verify member sizes or antenna/coax loading SSOE <br /> Group shall be contacted immediately if the existing conditions are not as represented on the tower elevation <br /> contained in this report in order to evaluate the significance of the discrepancy. SSOE Group has not performed <br /> a condition assessment of the tower foundation. This report does not replace a full tower inspection. The tower <br /> and foundation are assumed to have been properly fabricated, erected and maintained and to be in good <br /> condition, twist free, and plumb. <br /> The engineering services rendered by SSOE Group in connection with this structural analysis are limited to a <br /> computer analysis of the tower structure and theoretical capacity of its main structural members. All tower <br /> components have been assumed to resist dead loads only when no other loads are applied. No allowance has <br /> been made for any damaged, bent, missing, loose, or rusted members(above and below ground). No allowance <br /> has been made for any loose bolts or cracked welds. <br /> For the purposes of this report, SSOE Group has assumed that all connections in the tower are sufficient to <br /> develop the allowable strength of the associated members. SSOE Group has not performed engineering <br /> analysis to verify adequacy of these connections. <br /> It is the owner's responsibility to determine the amount of ice accumulation, if any, that should be considered in <br /> the structural analysis. <br /> The attached sketches are a schematic representation of the analyzed tower. If any material is fabricated from <br /> these sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and <br /> clearances in the field. Any mentions of structural modifications are reasonable estimates and should not be <br /> used as a construction document. Construction documents depicting the required modification are obtainable <br /> from SSOE Group, but are beyond the scope of this report. <br /> Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as part of our work. We <br /> recommend that material of suitable size and strength be purchased from a reputable tower manufacturer. <br /> SSOE Group makes no warranties, expressed and/or implied, in connection with this report and disclaims any <br /> liability arising from material, fabrication, and erection of this tower. SSOE Group will not be responsible <br /> whatsoever for, or on account of, consequential or incidental damages sustained by any person, firm, or <br /> organization as a result of any data or conclusions contained in this report. The maximum liability of SSOE <br /> Group pursuant to this report will be limited to the total fee received for preparation of this report. <br /> tnxTower Report-version 6.0 4 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.