Laserfiche WebLink
SPEC# DESCRIPTION OF THE WORK LOCATION <br /> COST <br /> 25 BASE & SHOE MOLDING <br /> Install new wood base. Trim to be Colonial. Entire House <br /> 27 NEW STUD WALLS <br /> Provide and install new framed wall and opening for <br /> 32" door between closet and bathroom. (See plan} M. Bedroom <br /> Provide and install new framing for Hall closets(4} and(2) <br /> Bedroom closets. Interior(6) <br /> Frame in openings far bi-fold doors. Check with A/C <br /> contractor to see which hall closet to use for Air Handler. Info Only <br /> PAGE TOTAL• <br /> 56 CEILING INSULATION <br /> Check e�sting ceiling insulation and add insulation as <br /> required to achieve an estimated R-30 (Minimum 10.375 ") <br /> in pitched roof areas. Contractor to post attic card on site. <br /> Second card to be supplied with final pay request. Entire House <br /> 58 INTERIOR WALL AND CEILING FINISH- <br /> PLASTER/DRYWALL REPAIR <br /> Repair a11 cracks and damaged surfaces to match e�sting. <br /> See Bid Specs 201 l. Apply new skim coat to ceilings and <br /> walls before installing texture. Ceilings to have a heavy <br /> knock-down te�ure. Walls to have orange peel te�ure <br /> Note: a11 teartures to be professionally applied through a <br /> spray texture machine, not a hand held hopper. Contractor <br /> to provide sample boazds prior to tearturing. Interior <br /> Provide and install new drywall on hallway closets, bedroom <br /> closets and wall between M. Bedroom and closet wall. Interior <br /> Remove a11 drywall and tile from walls. Provide and install <br /> new drywall in M. Bath which will then become M. Bedroom <br /> closet. M. Bath <br /> Include any damage caused from wa11 removals, additions, <br /> building modification etc., in price. Info Only <br /> CASE#: 10-6510 5136 17`� St. DATE: 07/30/12 PAGE: #8 <br />