Laserfiche WebLink
Project: YMCA <br /> Title: YMCA <br /> Type: Gymnasium <br /> (WEA File: FL TAMPA INTERNATIONAL AP.tm3) <br /> Building End Uses <br /> 1) Proposed 2) Baseline <br /> Tota I 130.00 216.60 <br /> $2,067 $3,490 <br /> ELECTRICITY(MBtulkWhl$) 130.00 216.60 <br /> 38067 63458 <br /> $2,067 $3,490 <br /> AREA LIGHTS 2s.�o 2�.�0 <br /> 7350 7936 <br /> $399 $436 <br /> MISC EQUIPMT 2i.6o 2i.6o <br /> 6328 6328 <br /> $344 $348 <br /> PUMPS& MISC o.�o o.io <br /> 22 22 <br /> $1 $1 <br /> SPACE COOL s�.90 its.so <br /> 16962 33835 <br /> $921 $1,861 <br /> VENT FANS 2s.3o s2.3o <br /> 7405 15337 <br /> $402 $844 <br /> Passing requires Proposed Building cost to be at most SO% PASSES <br /> of Baseline cost. This Proposed Building is at 59.2% <br /> EnergyGauge Summit0 Fla/Com-2010 Section 506.4 Compliant Software.Effective Date:March 15,2012 <br /> 8/14/2012 <br /> Page 4 of 9 <br />