Laserfiche WebLink
Project: YMCA <br /> Title: YMCA <br /> Type: Gymnasium <br /> (WEA File: FL TAMPA INTERNATIONAL AP.tm3) <br /> Water Heater Compliance <br /> Description Type Category Design Min Design Max Comp <br /> Eff Eff Loss Loss liance <br /> Water Heater 1 Gas Instantaneous Unknown 0.93 Not Checked <br /> water heater <br /> r Not Checked <br /> Project: YMCA <br /> Title: YMCA <br /> Type: Gymnasium <br /> (WEA File: FL_TAMPA INTERNATIONAL AP.tm3) <br /> Piping System Compliance <br /> Category Pipe Dia ls Operating Ins Cond Ins Req Ins Compliance <br /> �inches� Runout? Temp �Btu-in/hr Thick �inJ Thick �in] <br /> (F� .SF.F� <br /> Domestic and Service Hot Water 0 75 False 105.00 0.28 1.50 0.50 PASSES <br /> Systems <br /> �—PASSES —� <br /> EnergyGauge Summit0 Fla/Com-2010 Section 506.4 Compliant Software. Effective Date:March 15,2012 <br /> 8/14/2012 Page 7 of 9 <br />