My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13367
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2013 10:38:52 AM
Creation date
7/2/2013 10:38:50 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
12-13367
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7920 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION CON'I`RACf <br /> This Consttvction Contract("Contcsct")madc and effoctivc this 25th day of July,2012 ("Et�octive Date'�, <br /> by and betwoen Humana Inc.with offices at 500 We.st Main Str+at,Louisville,Kentucky 40202("Humans"), <br /> and Wilson 8t Company,Inc.with a principal place of busie�ss at 1227 East Broadway Strat,Suite 101, <br /> Oviodo,Florids 32765("Contractor"). <br /> WTTNESSETH, <br /> WHEREAS Humana intends to con.4wct: MazicetPODVT-Towaview Square-Relocation#1001294 <br /> �"�1�t") <br /> At the premises locatod at: �920 Gall Boulevard,Zephyrhills,Florida 33541 ("Premises"); <br /> NOW THEREFORE,Ham�ma and Contractor,for the considastions hereinafter set forth agroe as follows: <br /> Ardde 1.THE WOItK TO BE DONE: <br /> Contrsctor agrees to provide all the labor aad materials and to do all things nocessary for the gmper <br /> constr��ctioa of the work as described in Ez6ibit A,Proposal,sttsched herdo(the"Work"). <br /> ArHde 2.TIME OF COMPLETION: <br /> 1. The Work to be performod urder this Contract shall be c�ommencod after the exocution of this <br /> Convsct aad upon Contractor obtaining any necessary building pemrits.T6e Work�aU b�complet�d no <br /> bter t�an October 1,ZQ12. <br /> 2. The Wmic shall be decmod complete upon obtaining an approval at the final building inspoction by <br /> Humans and any otha pn�p�r aut6orities if applicable,obtaining any necessary Cutificate of Occupaacy, <br /> and receipt by Humana of all s�boontrsctor lien waivers.Pos,�ession of the Premises shsll be delivaed to <br /> Humana or its designa after issuance of a Final Permanent Certificate of Occupancy where applicable,and <br /> written punch list has boen developod,agr+eed to,signed amd dated by Humana and Contractor. <br /> 3. The time of completion nnay be extendod if delay in the}n+ogress of the Work is caused diroctly and <br /> solely by an act of negligence by Humam,material changes in the Work sppmved by Humana in writing, <br /> force majeure events,or a cause not within Coutractor's c+easonable conh+ol.Lack of materials or workforce <br /> on the part of Contractor shall not be considered a force maje�u�e event. <br /> Artlde 3.LUMP SUM CONTRACT: <br /> Contractor shall perfoim all of the above refenacod Work for the lump sum of two 6undrai nlnety-tive <br /> t6ousand,three 6uadrai twenty-dg6t ddbrs and one cent(S29S,3Z8.01). <br /> Artide 4.CHANGES IN WORK: <br /> Changes in the Work may bc accomplishod after the exocution of the Contract by a Chaage Oider.A Change <br /> Ordtr is a written instnuneat preparod by the Contractor aod submitted to the praper autl�orized Hun�am <br /> r�►taave for written appmval.Chaage Orders shall u�clude: description of the chsnge in the Work, <br /> amounts of adjuatinents to the Contract svm if any,and the extent of the adjustment in the Contract time if <br /> Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.