Laserfiche WebLink
rw1 <br />FINISH PLAN <br />SCALE: 1/4" = 1' -0" <br />GENERAL NOTES <br />1. PAINT DOORS AND TRIM PT -4 IN SCOPE OF WORK <br />SPECIFIC NOTES <br />1O NEW 8' -0" DIAMETER TERRAllO FLOOR ACCENT, SEE FINISH PLAN AND <br />SPECIFICATIONS <br />LEGEND <br />FINISH LEGEND <br />EXISTING TO CONDITIONS REMAIN, NO NEW WORK <br />CPT SHAW <br />TERRAllO FLOORING <br />CUSTOM CONSTRUCTION FOR SPACE <br />CARPET <br />INSTALLATION: MONOLITHIC <br />BROADLOOM CARPET <br />CPT -2 SHAW <br />WITH PADDING PER OWNER <br />FINISH LEGEND <br />CARPET SPECIFICATION <br />CPT SHAW <br />PRODUCT: EXAGGERATED WEAVE TILE, 59511,24X24 <br />CUSTOM CONSTRUCTION FOR SPACE <br />COLOR: ECLIPSE 12510 <br />INSTALLATION: MONOLITHIC <br />CONTACT: CATHERINE PACIFICI (813) 785 -9500 <br />CPT -2 SHAW <br />PRODUCT: GRADIENT, 5A153, ROLL GOODS <br />COLOR: ADRIFT 34512 <br />CONTACT: CATHERINE PACIFICI (813) 785 -9500 <br />PAINT <br />PT -1 SHERWIN WILLIAMS <br />(WALLS) DURATION HOME MATTE <br />MATCH BENJAMIN MOORE COLOR: DECORATOR WHITE <br />PT -2 SHERWIN WILLIAMS <br />(ACCENT 1) DURATION HOME MATTE <br />MATCH BENJAMIN MOORE COLOR: SILVER DOLLAR, COLOR: 1461 <br />PT -3 SHERWIN WILLIAMS <br />(ACCENT 2) DURATION HOME MATTE <br />MATCH BENJAMIN MOORE COLOR: PONDEROSA PINE, COLOR: 531 <br />PT -4 SHERWIN WILLIAMS <br />(DOOR & TRIM) DURATION HOME SEMI GLOSS <br />MATCH BENJAMIN MOORE COLOR: STERLING SILVER, COLOR: 1461 <br />PT -5 SHERWIN WILLIAMS <br />(THRESHOLD @ SW7068 GRIZZLE GREY <br />TELLER STAIONS) <br />PLASTIC LAMINATE <br />PL -1 WILSONART LAMINATE <br />D90 - 60 - NORTH SEA <br />RESIN <br />RES CUSTOM FABRICATION <br />BASIS OF DESIGN 2" CHROMA GHOST <br />CONTRACTOR TO SUBMIT SAMPLE FOR APPROVAL TO DESIGNER <br />STONE SLAB DESIGNER: SPACE / ROBERT BOWEN <br />ST -1 CAMBRIA <br />JEWEL COLLECTION <br />COLOR: WHITNEY 0115 <br />THICKNESS: 2CM <br />CONTACT: CUTTING EDGE GRANITE 727 - 530 -5579 <br />STRINGER <br />STRINGER JOHNSONITE <br />(STAIRS) GREY WG COLOR 48 <br />TERRAZZO FLOORING <br />TER STEWARD MELLON TERRAZZO <br />REFER TO SPECIFICATION <br />CONTACT: MARK NAUGLE 813 - 300 -1469 <br />VINYL BASE <br />VB -1 JOHNSONITE TIGHT LOCK WALL BASE <br />(OFFICES) 4" STRAIGHT <br />GREY WG COLOR 48 <br />VB -2 JOHNSONITE MANDALAY PROFILE <br />(COMMON GREY WG COLOR 48 <br />AREAS) <br />VINYL COMPOSITION TILE <br />VCT ARMSTRONG STATIC DISSIPATIVE TILE 12X12 <br />(SUPPLY) ARMOR GRAY 51951 <br />WOOD VENEER <br />WV DIXIE WOOD <br />GREY OBECHE COMPOSITE STAR #304 <br />CONTACT: PLYWOOD EXPRESS 954 - 956 -7576 <br />FINISH NOTES <br />GENERAL FINISH REQUIREMENTS <br />RETURN UNUSED, UNOPENED MATERIALS TO THE MANUFACTURER OR SUPPLIER FOR CREDIT TO <br />THE OWNER AFTER THE INSTALLATION HAS BEEN COMPLETED AND ACCEPTED, <br />UNUSED MATERIALS FROM OPEN PACKAGES ARE TO BE TURNED OVER TO THE OWNER FOR ATTIC <br />STOCK, <br />PROVIDE ALL MANUFACTURER'S STANDARD WARRANTIES TO THE OWNER. <br />ALL EXPOSED SURFACES SHALL BE FINISHED. WHERE THE FINISH IS NOT INDICATED OR UNCLEAR, <br />VERIFY THE FINISH WITH THE DESIGNER. <br />ALL FLOOR FINISH CHANGES SHALL OCCUR UNDER THE CENTERLINE OF DOORS IN THE CLOSED <br />POSITION. <br />INTERIOR CLASSIFICATIONS FOR CEILINGS, WALLS AND FLOORING SHALL BE CLASS A <br />MILLWORK <br />EXCEPT AS OTHERWISE SHOWN OR SPECIFIED, COMPLY WITH PROVISIONS OF THE <br />ARCHITECTURAL WOOD WORKING INSTITUTE QUALITY STANDARDS MOST RECENT ADDITION. <br />WORK SHALL BE PERFORMED IN THE HIGHEST GRADE APPLICABLE. <br />PROVIDE SHOP DRAWINGS. <br />ALTERNATES <br />EQUAL ALTERNATES FOR ANY INTERIOR FINISH TO BE SUBMITTED TO ARCHITECT FOR APPROVAL. <br />FINISH SCHEDULE <br />ROOM NUMBER AND NAME <br />FLOORING <br />BASE <br />WALLS <br />REMARKS <br />100 VESTIBULE <br />TER, CPT <br />VB -2 <br />PT -1 <br />101 LOBBY <br />TER, CPT <br />VB -2 <br />PT -1, PT -3 <br />102 SAFETY DEPOSIT <br />CPT <br />VB -1 <br />PT -1 <br />102A SAFETY DEPOSIT <br />CPT <br />VB -1 <br />PT -1 <br />102B SAFETY DEPOSIT <br />CPT <br />VB -1 <br />PT -1 <br />103 TELLERS <br />CPT -2 <br />VB -1 <br />PT -1, PT -2 <br />104 WORK ROOM <br />CPT -2 <br />VB -1 <br />PT -1 <br />105 VAULT <br />CPT -2 <br />VB -1 <br />PT -1 <br />106 CORRIDOR <br />CPT <br />VB -2 <br />PT -1, PT -3 <br />107 OFFICE <br />CPT <br />VB -1 <br />PT -1, PT -2 <br />108 CONFERENCE ROOM <br />CPT <br />VB -2 <br />PT -1, PT -2 <br />109 OFFICE <br />CPT <br />VB -2 <br />PT -1, PT -2 <br />C <br />U <br />o <br />C <br />`° <br />N <br />in <br />J <br />LL <br />Q <br />w <br />� <br />t <br />U <br />U <br />Q> <br />..0 <br />L <br />c <br />L <br />N <br />M <br />U <br />J <br />L <br />C <br />v- <br />L0 <br />Q) <br />M <br />in <br />J <br />LL <br />C <br />� <br />..0 <br />L <br />L <br />N <br />M <br />N <br />L.. <br />N <br />O N <br />^` <br />V/ <br />M 00 <br />c <br />O M ti <br />Q <br />O <br />C) <br />c <br />C O M <br />N <br />C- <br />Chi <br />(D <br />E <br />0) CO <br />M <br />UN <br />J Ln ti <br />ti <br />O N N <br />O N N <br />a) <br />c <br />vo��o <br />M —; N <br />U) - <br />C <br />On w U V) <br />W = 7U7 ° �1 Z <br />=> z U z o z w j 4 w w 5 j w O <br />out. 3�iaZ �z ~oa'¢�"�`�w� <br />�2NjtN�zZ�(� �7Z rUGN7 V � �¢ <br />zoza3G.T°�o��= °aw <br />w��'° <br />um, O U U y z <br />ad' <br />ow <br />of <br />of �nz3x3awzx`�3 <br />w w w W z 1 a z <br />i- w¢° <br />x� a Sap S x- Ci O i-73 U p O U O to Q a 7 ¢ z <br />F-O? N� -cnU W U ° <br />Project Number <br />1127.11 <br />Distribution <br />ISSUE DATE <br />PERMIT 02.10.2012 <br />Finish Plan <br />A2.2 <br />v- <br />L0 <br />Z <br />M <br />J <br />LL <br />W <br />� <br />..0 <br />L <br />L <br />U <br />N <br />_ <br />Z <br />0 <br />CU <br />> <br />CU <br />O <br />C- <br />m <br />C- <br />Chi <br />(D <br />O <br />M <br />UN <br />ti <br />Project Number <br />1127.11 <br />Distribution <br />ISSUE DATE <br />PERMIT 02.10.2012 <br />Finish Plan <br />A2.2 <br />