My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13444
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 10:41:13 AM
Creation date
7/18/2013 10:41:12 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
12-13444
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7920 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> . � �e�ur�t�r�n�utiona Wo�'k Orde�' <br /> . <br /> Stanley to install Bosch Intrusion System <br /> Permits required$$and labor provided for Ops to pull <br /> � All door position switches are DPDT, use 2"d pole for Intrusion system monitoring with Access supervision. <br /> 2. Intrusion system to be auto-armed at time TBD by local MGT <br /> 3 When Intrusion system is armed , a valid card read at any reader will disarm the Intrusion system. <br /> 4 Humana to provide network connection located inside Bosch Panel for the burglary <br /> 5. All TV locking devices&Knox Box by others. <br /> 6 All conduits, raceways, boxes,fittings, sleeves and pull-strings for the System shall be furnished and installed by <br /> others. <br /> �. Stanley to supply and install all cable for the new burglary devices <br /> s. 120VAC power,where required—by others. <br /> 9 Stanley will provide programming of intrusion alarm zones and system access configurations. Unauthorized <br /> changes to the factory programming by the customer after the system is in operation resulting in Stanley service <br /> calls will not be covered by warranty. <br /> �o Pricing assumes work shall be performed during normal working hours,8:00 amthru 4:30 pm, Monday thru <br /> Friday, excluding weekends and holidays. <br /> �1. Any required roof penetrations and sealing of penetrations by others. <br /> �2. Any changes to design, location or function of security devices must be pre-approved by Humana Global Security <br /> and may require a change order <br /> �3. Program contacts to be normally closed <br /> Q-00312574 <br />
The URL can be used to link to this page
Your browser does not support the video tag.