My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13479
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 11:12:03 AM
Creation date
7/18/2013 11:12:02 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
12-13479
Building Department - Name
ROGNAS,ROGER & REBECCA
Address
5110 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�M�ilBar. Roof ina, Inc. <br /> �15911 U.S. 301, Dade City, FL 335Z3 5tate Cert Raofer#CCCI329U92 <br /> Ph: SD�/56Z-2393 Fax: 35Z/567-4454 RCI Reg Roof Consultant #0149 <br /> mil6arCearthlink.net <br /> �,. <br /> ROOF PROPOSAL pape 1 of 2 �� � <br /> DATE: 08/17/12 <br /> TO: ROGNAS, ROGER & REBECCA PH• 813/779-0969 <br /> 5110 6T"STREET rebeccaroQnasCa�qmail com <br /> ZEPHYRHILLS, FL 33542-4944 <br /> ��B ROGNAS RESIDENCE <br /> 5110 6'�STREET <br /> ZEPHYRHILLS, FL 33542-4944 <br /> SHINGLE RE-ROOF —see attached drawing ^ <br /> (Scope of work does not include the aluminum pan roof or the garage) <br /> 1. Tear off and haul away existing one-layer shingle roofi�g system. <br /> . <br />. <br /> 2. Re-fasten the existing plywood roof deck in accordance with the Florida Building Codes. <br /> 3. Provide and install the new 15 Ib. saturated felt paper(ASTM D-226) secondary water barrier in accordance with <br /> the Florida Building Codes. Install finro layers of 15 Ib felt on low sloped roof areas with 3.12 roof pitch as required <br /> by the current Florida Building Code (Current Florida Building Codes requires that felt installed on roof areas with <br /> 3:12 roof pitch be installed with an 18" lap (1/2 lapped) resulting in 2 layers of 15 Ib or 30 Ib felt. <br /> 4 Provide and install new algae-resistant fiberglass shingles, Owner to choose shingle color from manufacturer's <br /> select colors. Provide manufacturer's limited shingle warranty. Please see options on page 2. <br /> 5 Replace all valley flashing and re-flash roof penetrations. <br /> Re-flash existing chimney. <br /> 6• Provide and install new lead boots for the plumbing vents. <br /> 7 Provide and install new pre-finished "brown" aluminum eavedrip <br /> 8 Repair/Replacement of any rotten or damaged wood (deck, fascia, trim, framing, etc.) will be completed on a cost- <br /> plus basis above and beyond the contract price. �$s2.so per a�Xa�x�i2��sheet of CDX plywood replace, labor&materials;$2s.25 <br /> per 1/2 sheet;$13.13 per 1/4 sheet.) <br /> 9. MilBar Roofing, Inc. to provide a 5-year workmanship warranty to the original purchaser that covers shingle roof <br /> leaks; exclusions: storm damage, work done or damage by others, tree damage, and/or structural damage to roof <br /> deck. <br /> 10 Owner to provide access to roof for delivery truck for loading/unloading of roofing materials. <br /> 11. MilBar Roofing, Inc. to provide General Liability and Worker's Compensation Insurance($2,000,000 limit)and re- <br /> roofing permit. <br /> --------------------------------------------------------------------- <br /> We propose to furnish material and labor,complete In accordance wtth above specifications,for the Contract Sum of: <br /> As stated in Options on Page 2. <br /> ______________________________________________ <br /> Payment to be made as follows: Due on Com I �-------------------- <br /> ---------- P p etion. <br /> � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.