My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13533
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2013 10:14:30 AM
Creation date
7/22/2013 10:14:27 AM
Metadata
Fields
Template:
Building Department
Company Name
T-MOBILE
Building Department - Doc Type
Permit
Permit #
12-13533
Building Department - Name
T-MOBILE
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ;; <br /> � <br /> ., <br /> ::� <br /> m <br /> Date: July 30, 2012 �� <br /> Scott Krueger Tower Engineering Professionals <br /> T-Mobile Towers 3703 Junction Blvd <br /> 12920 SE 38th Street Raleigh, NC 27603 <br /> Bellevue, WA 98006 (919) 661-6351 <br /> Office:(425) 383-5313 bboudreauCa�tepqroup.net <br /> Subject: Structural Analysis Report- Revision 5 <br /> T-Mobile Designation: T-Mobile Network Modernization <br /> T-Mobile Site Number: A2G0082A <br /> T-Mobile Site Name: Pasco County(VS) <br /> Engineering Firm Designation: TEP Project Number: 110908 <br /> Site Data: 38122 Henry Dr., Zephyrhills, Pasco County, FL 33540 <br /> Latitude N 28°14'S2.9'; Longitude W 82° 11'9.4" <br /> 190 Foot-Self-Supporting Tower <br /> Dear Mr. Krueger, <br /> Tower Engineering Professionals is pleased to submit this "Structural Analysis Report" to determine the <br /> structural integrity of the above mentioned tower <br /> The purpose of the analysis is to determine structural acceptability of the structure stress level Based on our <br /> analysis we have determined the stress level for the structure and foundation, under the following load case, to <br /> be: <br /> LC1: Existing +Proposed Equipment Sufficient Capacity <br /> Note�See Table 1 for the existing and proposed loading. <br /> Structure Controlling Component <br /> Ca acit <br /> 90 5% Diagonal Bolts(140'- 160) <br /> The analysis has been performed in accordance with the ANSI/TIA-222-G-2-2009 Structural Standard for <br /> Antenna Suaportinp Structures and Antennas-Addendum 2 and the 2010 Florida Buildinq Code <br /> All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances <br /> listed in Table 1 for the determined available structural capacity to be effective. <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional <br /> services to you and T-Mobile Towers. If you have any questions or need further assistance on this or any other <br /> projects please give us a call. <br /> Respectfully bmitt d by� <br /> 1a�;E ,� ' �;�� <br /> Andrew T. Maldl�fie, E. ti:�~^ `�'� I ri" '��:��'� <br /> .�' `y ./ <br /> //' � � 'f,', o S _ <br /> � ' . .a :a: <br /> / Ya • <br /> Revision � � 17�'j��'��7WI►- :� � <br /> Date Issued Description �;�;� �--- <br /> # ;�� .� � °w- <br /> . _ .°,€,� <br /> 0 March 8, 2011 Original structural analysis report ± � :� `'`3 �� <br /> �� ..� <br /> 1 April 21, 2011 Revised to include proposed Metro PCS loading a�'�� ' �. ,.�� `�-'c�"".��� <br /> ,.,... , . <br /> 2 July 5, 2011 Revised to include proposed Verizon loading , _ � <br /> 3 August 10, 2011 Revised T-Mobile proposed/exiting/future loading ' ` ' <br /> 4 June 12, 2012 T-Mobile Network Modernization with revised Verizon � <br /> loadin <br /> 5 Ju/y 30, 2012 T-Mobile updated Network Modernization and wind speed <br /> revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.