My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13533
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2013 10:14:30 AM
Creation date
7/22/2013 10:14:27 AM
Metadata
Fields
Template:
Building Department
Company Name
T-MOBILE
Building Department - Doc Type
Permit
Permit #
12-13533
Building Department - Name
T-MOBILE
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ju/y 30,2012 <br /> 190 Ft Se/f-Supporting Tower Structura/Ana/ysis A2G0o82A Pasco County(VS) <br /> Project Number 110908, Revision 5 Page 5 <br /> 3.1) Analysis Method <br /> tnxTower (version 6.0.4.0), a commerciaily available analysis software package, was used to create a <br /> three-dimensional model of the tower and calculate member stresses for various loading cases <br /> Selected output from the analysis is included in Appendix A. <br /> 3.2) Assumptions <br /> 1) Tower and structures were built in accordance with the manufacturer's specifications <br /> 2) The tower and structures have been maintained in accordance with the manufacturer's <br /> specification. <br /> 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Table 1 <br /> 4) TEP assumed the following material properties� <br /> a) Legs: ASTM A572 Gr. 50 <br /> b) Bracing:ASTM A36 <br /> c) Anchor Bolts. ASTM A354-BC <br /> 5) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is <br /> left to the carrier or tower owner to ensure conformance. See Table 6. <br /> 6) Tower Engineering Professionals, Inc. (TEP) did not analyze antenna supporting mounts as part <br /> of this structural analysis report. TEP assumes that all antenna mounts and mounting hardware <br /> are structurally sufficient to carry the full design capacity requirements of appurtenance wind <br /> area and weight as provided by the original manufacturer specifications. It is the carrier's <br /> responsibility to ensure compliance to the structural limitations of the existing and/or proposed <br /> antenna mounts. TEP did not perform a site visit to verify the size, condition or capacity of the <br /> antenna mounts <br /> 7) This report is not a construction document. <br /> 4) ANALYSIS RESULTS <br /> Table 4-Section Capacity(Summary) <br /> �Ion Elevatlon(ft) CO T�°t Size E��t p(�b� F"P allow % Pass 1 Fall <br /> (Ib) Capadty <br /> T1 190-180 ' Leg i PIPE 2.5 STD(SCH 40) � 3 -10644.600 �57361.699 � 18.6 � Pass <br /> T2 180- 160 Leg PIPE 3_5 STD ' 21 -48512.602 !104062.000� 46.6 � Pass <br /> T3 160-140 Leg Pipe 5 STD(SCH40) 51 -95587 703 �169395.000' 56.4 Pass <br /> T4 140-120 Leg Pipe 5 STD(SCH40) 75 -152292.000�169395.000� 89.9 Pass <br /> - - - - --, - - , <br /> T5 120- 100 Leg PIPE 8 STD(SCH40) 99 -210590.000 �358212.000! 58.8 Pass ; <br /> T6 100-80 Leg Pipe 10 STD(SCH40) � 123 -264286.000�498329.000� 53.0 Pass <br /> T7 80-60 Leg Pipe 10 STD(SCH40) 141 -323140.000 i498329.000� 64.8 Pass <br /> T8 60-40 Leg Pipe 12 STD(SCH40) 159 -382016.000�623679.000� 61.3 Pass <br /> T9 40-20 Leg Pipe 12 STD(SCH40) 177 -440095.000 f623679.000 j 70.6 � Pass <br /> T10 20-0 Leg P12EH ' 195 -497646.000 �822322.000� 60.5 r Pass ' <br /> Ti 190-180 . Diagonal L1 3/4x1 3/4x3/16 11 -3047.030 ; 6584.260 ' 46.3 Pass � <br /> T2 180- 160 Diagonal L2x2x3/16 29 -6465.380 ; 9562.730 � 67.6 Pass <br /> T3 160-140 Diagonal L2 1/2x2 1/2x3/16 60 -8388.560 , 11428.300 � 90.5(b) ; Pass <br /> T4 140-120 ' Diagonal ; L3x3x3/i 6 81 -10598.600 ; 15818200 � 67 0 ' Pass ' <br /> T5 120-100 Diagonal L3x3x3/16 105 -11544.200 � 14078.100 ; 82.0 r Pass <br /> T6 100-80 Diagonal L3 1/2x3 1/2x1/4 129 -14559.300 ,20523.699 ' 70.9 Pass � <br /> T7 80-60 Diagonal L3 1/2x3 1/2x1/4 147 -15450.900 : 17892.600 � 86.4 � Pass <br /> T8 60-40 Diagonal L3 1/2x3 1/2x3/8 165 -16743.801 '23259.500 � 72.0 Pass <br /> T9 40-20 Diagonal L3 1/2x3 1/2x3/8 183 -17497 100 20566.400 f 85.1 Pass <br /> tnxTower Report-version 6 0 4 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.